My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 52CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 2 | QUALIFICATIONS <br />ENGINEERS · PLANNERS · PROGRAM MANAGERS <br />Recognizing that transit-supportive land use plays a critical role in the success of major rapid transit investments, the Miami-Dade Transportation Planning Organization (TPO) has been tasked to examine this interrelationship to complement the Strategic Miami Area Rapid Transit (SMART) Plan rapid transit initiative. The SMART Plan is intended to help achieve county and community goals though the integration of transportation, land use planning and development of strategies. <br />The purpose of this work order is to develop a Land Use Plan for the North Corridor of the SMART Plan in support of transit. The SMART Plan includes six (6) major rapid transit corridors and a Bus Express Rapid Transit Network. The North Corridor study focuses on providing premium transit along SR-9/SR-817/NW 27th Avenue. The North Corridor stretches 13 miles from the Miami-Dade/Broward County Line to the Airport Expressway along NW 27th Avenue. The Corridor will serve historically under-represented low-income communities, providing the opportunity to better access jobs, as well as establishing a key regional mobility linkage for the area’s job centers, stadium district, and higher education. <br />The study includes public, on-street transit stations/stops located along the corridor within the study limits. The study also includes public and/or private facilities located adjacent to or off-corridor where potential park-and-ride and/or transit terminals (including the Miami Dade College North Campus) are being considered. The southern project limits include consideration of two major terminals: the MIC, and the proposed Downtown Miami Intermodal Terminal at Government Center via the Martin Luther King (MLK) Jr Metrorail Station at NW 27th Avenue and NW 64th Street. <br />The purpose of this project is to develop the Transit Oriented Development (TOD), First and Last Mile, and Transit Hubs components to support the economic mobility and accessibility plans for the SMART North Corridor. Several studies by DTPW, the Miami-Dade TPO and other partner agencies have been completed in recent years. <br />CLIENT NAMECLIENT NAMEMiami-Dade County TPO <br />ADDRESSADDRESS111 NW 1st Street, Suite 920 Miami, FL 33128 <br />CONTACT PERSONCONTACT PERSONMaria Teresita Vilches-Landa, PE Deputy Director - Transportation <br />PHONE NUMBERPHONE NUMBER 305-375-4507 <br />EMAIL EMAIL Maria.Vilches@mdtpo.org <br />PROJECT START DATEPROJECT START DATE 2018 <br />PROJECT COMPLETION DATEPROJECT COMPLETION DATE 2021 <br />CONTRACT TYPE CONTRACT TYPE On-Call Services <br />PROJECT COST PROJECT COST $800,000 <br />SCOPE OF SERVICESCOPE OF SERVICENorth Dade Transitway Land Use Scenario | Visioning | Planning and Economic Mobility and Accessibility Plan Study <br />SMART PLAN NORTH CORRIDOR GENERAL PLANNING SERVICES <br />MIAMI-DADE COUNTY TPO
The URL can be used to link to this page
Your browser does not support the video tag.