My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 59CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 2 | QUALIFICATIONS <br />ENGINEERS · PLANNERS · PROGRAM MANAGERS <br />As part of a contract for Various Engineering Disciplines Services, Corradino provides Traffic and Transportation Engineering Services, including traffic engineering and plan reviews as part of the Development Review Committee, including the Park Road Planned Unit Development project. Corradino conducted a feasibility study evaluating design options for the Johnson Street Bridge Widening/Replacement Project and prepared the final design plans and permitting for the Johnson Street Bridge between N. 31st Avenue and N. 30th Road. Corradino also provided utility relocation design services for the required relocation of three public utilities in the City of Hollywood. <br />Corradino provided construction management services, including daily site observations, construction inspection support, resident contract compliance, and community outreach for the city’s Tidal Flooding Mitigation and Shoreline Protection Project (City Project No. DCM-001187). The project was funded by the FDEP Resilient Florida Grant 22FRP13 and was designed to address coastal flooding in the North and South Lakes areas and select segments of the barrier island. <br />CLIENT NAMECLIENT NAMECity of Hollywood <br />ADDRESSADDRESS2600 Hollywood Boulevard, Room 422 Hollywood, FL 33021 <br />CONTACT PERSONCONTACT PERSONMark Johnson Senior Project Manager <br />PHONE NUMBERPHONE NUMBER 954.921.3991 <br />EMAIL EMAIL mljohnson@hollywoodfl.org <br />PROJECT START DATEPROJECT START DATE 11/2021 <br />PROJECT COMPLETION DATEPROJECT COMPLETION DATE Ongoing <br />CONTRACT TYPE CONTRACT TYPE Continuing <br />Services Contract <br />PROJECT COST PROJECT COST Variable per individual <br />task work order assignment <br />SCOPE OF SERVICESCOPE OF SERVICETraffic Engineering and Transportation Planning; Civil and Transportation Engineering; Construction Engineering and Inspection Services <br />VARIOUS ENGINEERING SERVICES CONTINUING CONTRACTS <br />CITY OF HOLLYWOOD
The URL can be used to link to this page
Your browser does not support the video tag.