My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 62CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 2 | QUALIFICATIONS <br />ENGINEERS · PLANNERS · PROGRAM MANAGERS <br />Lead Traffic Engineer who prepared the traffic study which evaluated the need for mid-block crosswalks along a stretch of Andrews Avenue between Oakland Park Boulevard and Prospect Road. Consultant completed a safety analysis including review of crash history along the corridor using Signal Four Analytics. Consultant evaluated the proposed midblock crosswalk locations based on criteria of the Traffic Engineering Manual and Manual on Uniform Traffic Control Devices per Broward County Traffic Engineering Division. Consultant collected pedestrian traffic data including four-hour pedestrian volume counts at ten (10) proposed mid-block crossing locations and 24-hour bi-directional traffic counts were collected for Andrews Ave between Oakland Park Boulevard and NW 38th Street and on Andrews Avenue south of Prospect Road. <br />Consultant also evaluated the traffic operational conditions at the four signalized intersections along Andrews Avenue at Prospect Road, NE 38th Street, and E. Oakland Park Boulevard to determine the optimal signal timings and the appropriate length of future dedicated turn lanes. Design plans were developed for the transportation infrastructure improvements. <br />CLIENT NAMECLIENT NAMECity of Oakland Park <br />ADDRESSADDRESS1100 Park Lane East Oakland Park, FL 33334 <br />CONTACT PERSONCONTACT PERSONSierra Marrero Assistant City Manager/Chief Operating Officer <br />PHONE NUMBERPHONE NUMBER 954.630.4479 <br />EMAIL EMAIL sierra.marrero@oaklandparkfl.gov <br />PROJECT START DATEPROJECT START DATE 2016 <br />PROJECT COMPLETION DATEPROJECT COMPLETION DATE 2018 <br />CONTRACT TYPE CONTRACT TYPE On Call GEC Contract <br />PROJECT COST PROJECT COST $60,000 <br />SCOPE OF SERVICESCOPE OF SERVICETraffic and Transportation Engineering <br />ANDREWS AVENUE COMPLETE STREETS IMPROVEMENTS <br />CITY OF OAKLAND PARK
The URL can be used to link to this page
Your browser does not support the video tag.