My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
V3 Architectural Group, Inc. Bid Document (12)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
V3 Architectural Group, Inc
>
V3 Architectural Group, Inc. Bid Document (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:26:52 PM
Creation date
8/31/2026 3:26:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | Architects <br />36 <br />STAFFING <br />TEAM RESPONSIBILITY MATRIX <br />Team Member Firm Proposed Role Primary Responsibilities <br />Jose A. Vidal, AIA, NCARB, LEED AP V3 President / Lead Architect Executive oversight; architectural leadership; client <br />coordination; programming and design direction; scope, <br />schedule, and consultant coordination; permitting support; <br />construction-phase oversight <br />Manual d. Fernandez, AIA V3 Vice President /QA/QC Architectural QA/QC; independent technical reviews; <br />drawing and specification coordination; code and regulatory <br />review; constructability and interdisciplinary coordination <br />Michele Gonzalez-Vidal V3 Principal / Interior Design Programming; space planning; interior architecture and <br />design; functional and operational planning; material and <br />finish coordination; integration of interior requirements with <br />architectural and engineering systems <br />Vincent McNish, PE CxA, LEED AP, CPD TLC Senior Mechanical Engineer / <br />M/HVAC/Plumbing Lead <br />Mechanical and HVAC systems; plumbing systems; <br />existing-system assessments; equipment replacement and <br />renovation; system performance and efficiency; construction <br />documents; multidisciplinary coordination; construction- <br />phase support <br />Bunrith Heng, MS, PE HBC Structural Engineer Structural analysis and design; buildings and foundations; <br />structural calculations; rehabilitation and strengthening; <br />retaining and sheet pile walls; construction documents; <br />constructability and structural QA/QC <br />Sonny Abia, PhD, PE HBC Structural Engineer / Building <br />Assesment <br />Mechanical and HVAC systems; plumbing systems; <br />existing-system assessments; equipment replacement and <br />renovation; system performance and efficiency; construction <br />documents; multidisciplinary coordination; construction- <br />phase support plans review; permitting; cost estimating; QA/ <br />QC and construction-phase support
The URL can be used to link to this page
Your browser does not support the video tag.