Laserfiche WebLink
City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | Architects <br />36 <br />STAFFING <br />TEAM RESPONSIBILITY MATRIX <br />Team Member Firm Proposed Role Primary Responsibilities <br />Jose A. Vidal, AIA, NCARB, LEED AP V3 President / Lead Architect Executive oversight; architectural leadership; client <br />coordination; programming and design direction; scope, <br />schedule, and consultant coordination; permitting support; <br />construction-phase oversight <br />Manual d. Fernandez, AIA V3 Vice President /QA/QC Architectural QA/QC; independent technical reviews; <br />drawing and specification coordination; code and regulatory <br />review; constructability and interdisciplinary coordination <br />Michele Gonzalez-Vidal V3 Principal / Interior Design Programming; space planning; interior architecture and <br />design; functional and operational planning; material and <br />finish coordination; integration of interior requirements with <br />architectural and engineering systems <br />Vincent McNish, PE CxA, LEED AP, CPD TLC Senior Mechanical Engineer / <br />M/HVAC/Plumbing Lead <br />Mechanical and HVAC systems; plumbing systems; <br />existing-system assessments; equipment replacement and <br />renovation; system performance and efficiency; construction <br />documents; multidisciplinary coordination; construction- <br />phase support <br />Bunrith Heng, MS, PE HBC Structural Engineer Structural analysis and design; buildings and foundations; <br />structural calculations; rehabilitation and strengthening; <br />retaining and sheet pile walls; construction documents; <br />constructability and structural QA/QC <br />Sonny Abia, PhD, PE HBC Structural Engineer / Building <br />Assesment <br />Mechanical and HVAC systems; plumbing systems; <br />existing-system assessments; equipment replacement and <br />renovation; system performance and efficiency; construction <br />documents; multidisciplinary coordination; construction- <br />phase support plans review; permitting; cost estimating; QA/ <br />QC and construction-phase support