Laserfiche WebLink
City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | Architects <br />48 <br />YEARS OF EXPERIENCE: 11 <br />EDUCATION <br />Bachelor of Science, Electrical Engineering, Florida International University, 2017 <br />LICENSES / CERTIFICATIONS / TRAINING <br />Registered Professional Florida Engineer #93410 <br />Daniel is a dynamic electrical engineer with a strong background in designing electrical systems. He provides multidisciplinary <br />review of completed construction drawings for accuracy coordination and conformity to standards, delivering innovative solutions <br />that meet client needs and project requirements. <br />EXPERIENCE <br />• Boca Raton Continuing Services, Boca Raton, FL. TLC provides MEP/FP engineering services since 2015 for multiple <br />projects at the City of Boca Raton. Some of the projects include: City Hall first floor renovation; new generators for the <br />Downtown Library, Spanish River Library, and Building Administration Code Enforcement facility; Police Department <br />Pistol Range rooftop unit; Fire Station #7 AC design services. <br />• Palm Beach Gardens Police Department Renovation and Expansion, Palm Beach Gardens, FL. First floor expansion <br />of 2,778 SF and second floor architectural renovations to administration area for approximately 8,598 SF. $2 Million / <br />11,376 sf. <br />Daniel Sotomayor Saldana, PE, LEED Green AssociateEngineer <br />YEARS OF EXPERIENCE: 44 <br />EDUCATION <br />Liberty University, Ph.D., Business Administration in Organizational Leadership, 2017 <br />Liberty University, Ph.D., Engineering <br />LICENSES / CERTIFICATIONS / TRAINING <br />Registered Professional Florida Engineer #42641 <br />Ralph has extensive experience designing sophisticated mechanical management systems. He focuses on, not only the <br />initial building systems design, but also on the long-term functionality and efficiency for the users of the buildings. Ralph is a <br />strategic thinker with a track record of delivering high quality projects. <br />EXPERIENCE <br />• City of Miami Beach Continuing Services, Miami Beach, FL. MEP Engineering contract for miscellaneous <br />services including the following projects: Bass Museum Fire Pump Replacement, Miami Beach Convention Center 40 <br />Y Recertification, Fire Station No.3 Generator Replacement, Property Management Building Generator, North Shore <br />Youth Center Generator. <br />• Boca Raton Continuing Services, Boca Raton, FL. TLC provides MEP/FP engineering services since 2015 for <br />multiple projects at the City of Boca Raton. Some of the projects include: City Hall first floor renovation; new generators <br />for the Downtown Library, Spanish River Library, and Building Administration Code Enforcement facility; Police <br />Department Pistol Range rooftop unit; Fire Station #7 AC design services. <br />Dr. Ralph Baeza, PE LEED APSenior Engineer