Laserfiche WebLink
City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | Architects <br />54 <br />Phase 3 – Final Design / Construction Documents <br />HBC leads structural design and documentation; TLC leads mechanical, HVAC, and plumbing design and documentation; <br />and V3 leads architectural design, interior design, site and landscape coordination, and overall document assembly including <br />electrical, generator, and elevator coordination where those disciplines are engaged by the City for a given task order. Progress <br />reviews are held with City staff at the 60%, 90%, and 100% design stages, with each submittal accompanied by an updated <br />Estimate of Construction Cost. Before any set is finalized, the team performs the interdisciplinary quality review described in <br />Section 4.7 to resolve dimensional and constructability conflicts. <br />Milestones: 60%, 90%, and 100% Construction Document submittals reviewed and approved by City staff. <br />Key Deliverable: Ten sets of signed and sealed Construction Documents, technical specifications, and bid documents, plus <br />CADD files as required. <br />Phase 4 – Permitting, Bidding & Negotiation <br />V3 coordinates permit submittal to the City of Sunny Isles Beach Building Division and Miami-Dade County, with HBC and <br />TLC responding directly to structural and MEP plan-review comments to keep review cycles short. V3 attends all pre-bid <br />conferences, prepares and distributes minutes, and issues addenda through the City’s Purchasing Administrator as needed. <br />If requested, our team evaluates bids and bidders and provides a recommendation for award. <br />Key Deliverable: Complete permitting package; bid support documentation; award recommendation, if requested. <br />Phase 5 – Construction Administration & Closeout <br />During construction, V3, HBC, and TLC review shop drawings and submittals within each discipline, respond to Requests for <br />Information, attend site meetings, and issue Certificates for Payment based on site observation of work progress. At closeout, <br />the team assists with final inspections, compiles as-built CADD drawings reflecting all field changes, and prepares warranty <br />documentation required by the Architect and Engineers of Record. <br />Key Deliverable: Certified progress payments, as-built record drawings, and complete closeout documentation. <br />OVERALL ORGANIZATION FOR COMPLETING THE PROJECT <br />Every task order is organized around a single point of responsibility: a V3 Principal-in-Charge and Project Manager who serve <br />as the City’s consistent point of contact from Notice to Proceed through final closeout. The Project Manager allocates his <br />or her time across the team’s concurrent commitments to ensure the assigned task order receives priority attention, directly <br />coordinates the HBC structural lead and TLC mechanical/plumbing lead, and is personally accountable to the City’s Project <br />Manager for schedule, budget, and quality on every assignment. <br />Role Firm / Discipline Primary Responsibility <br />Principal-in-Charge V3 Architectural Group Contractual authority, firm-wide resource commitment, and <br />final quality sign-off on every task order. <br />Project Manager / Architect of <br />Record V3 Architectural Group Single point of contact for the City; leads scope definition, <br />coordinates HBC and TLC, manages schedule, budget, <br />and deliverables end to end. <br />Project Architect(s) & Interior <br />Designers V3 Architectural Group Architectural design, space planning, interior design, code <br />compliance, construction documents, and construction <br />administration. <br />Structural Engineer of Record HBC Engineering Company Structural assessment, design, and construction <br />documents for new work and rehabilitation of existing <br />structures; structural threshold inspections as required. <br />Mechanical / HVAC / Plumbing <br />Engineer of Record TLC Engineering Solutions Mechanical, HVAC, and plumbing design, specifications, <br />and construction-phase support. <br />QA/QC Reviewers V3, HBC & TLC (each firm) Independent, discipline-specific quality review at every <br />submittal milestone, feeding into V3's composite <br />interdisciplinary check. <br />