Laserfiche WebLink
MIRAMAR POLICE HEADQUARTERS DCP <br />70,000 SQ. FT. 3 – STORY POLICE HEADQUARTERS BUILDING – 6/2013 <br />Designed as an Emergency Operations Center with redundant power <br />supply and mechanical systems. The building is secured with card <br />access control, security cameras, and the fortified perimeter construction <br />has been designed to enhanced 'blast-type' structural criteria. The <br />project is designed to comply with CALEA ACCREDITATION <br />STANDARDS. $24,000,000 Construction. <br />Chief’s Suite, Detective Area <br />Sergeants and Captains Area <br />Dispatch <br />Booking and Interview Rooms <br />Jail Cells <br />Evidence Processing and <br />Storage <br />Sally Port <br />Gym <br />Lockers <br />Showers <br />Mail and Briefing Room <br />Ammunition Storage <br />Break Room <br />Conference Room <br />Records Storage <br />Location: <br />Miramar, FL <br />Owner: <br />City of Miramar <br />Owner’s Representative: <br />Daryll Johnson, CGC <br />Construction <br />Administrator, Division <br />Director <br />954-602-3302 <br />djohnson@miramarfl.gov <br />Services Provided: <br />Master Planning <br />Programming <br />Schematic Design <br />Design Development <br />Renderings <br />Design Criteria Package <br />Interior Design <br />Site Plan Approval <br />LEED Design <br />Construction Doc. Review <br />Construction Oversight <br />Architecture  Planning Design <br />Walters Zackria Associates, PLLC | RFQ # 26-07-01 | Page 42