My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction, Inc. & West Architecture + DeBid Document (22)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
West Construction, Inc. & West Architecture + Design, LLC
>
West Construction, Inc. & West Architecture + DeBid Document (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:30:58 PM
Creation date
8/31/2026 3:29:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />4. APPROAH / METHODOLOGY <br />West Architecture + Design, LLC <br />820 North 4th Street, Lantana, Florida 33462 <br />Phone: 561-588-2027 / Fax: 561-582-9419 <br />Architecture License: AR93859 / AA26001503 <br />www.west-arch.com <br />Decision and action-item logs <br />Permit-comment tracking <br />Early identification of long-lead items <br />Subconsultant workload monitoring <br />Recovery plans for delayed activities <br />Prompt notification to the City of material schedule risks <br /> <br />If a potential delay is identified, WAD will evaluate the cause, effect, and available recovery <br />options. Measures may include reallocating personnel, resequencing activities, advancing <br />independent work, conducting additional coordination meetings, or preparing partial submis- <br />sions when permitted by the City. <br /> <br />4.10 MANAGING MULTIPLE TASK ORDERS <br /> <br />Because continuing contracts often involve concurrent assignments, WAD will maintain a <br />master workload and resource schedule showing: <br /> <br /> <br />This resource-planning system allows WAD to anticipate staffing needs and reallocate per- <br />sonnel before an assignment is affected. Dedicated project leads will remain assigned to <br />their projects to maintain continuity and accountability. <br /> <br />WAD maintains the capacity to respond to ordinary on-call requests within approximately 24 <br />to 48 hours. Emergency assignments will be prioritized in coordination with the City. <br /> <br />QUALITY ASSURANCE & QUALITY CONTROL <br /> <br />4.11 QA/QC PROGRAM <br /> <br />WAD’s QA/QC process is incorporated throughout the project rather than limited to a final <br />document review. The project manager is responsible for day-to-day quality control, while the <br />designated QA/QC manager provides an independent technical review. <br /> <br />Each discipline will first review its own work. WAD will then conduct an interdisciplinary re- <br />view to identify scope gaps and coordination conflicts. <br /> <br /> <br />Active task orders <br />Required disciplines <br />Upcoming submissions <br />Staff assignments <br />City review periods <br />Permitting milestones <br />Construction-phase commitments <br />Available staff capacity <br />Submission Primary Review Focus <br />30% Program, existing conditions, code criteria, design concept, and basis of <br />60% Interdisciplinary coordination, constructability, system integration, and <br />cost <br />90% Completeness, permit readiness, bid clarity, specifications, and City <br />Final Signed-and-sealed document verification and authorization for release <br />Construction Submittals, RFIs, field conditions, changes, and closeout requirements <br />64
The URL can be used to link to this page
Your browser does not support the video tag.