Laserfiche WebLink
HBC Engineering Company | 101 <br />Leandro Vazquez <br />Utility Coordinator & Permitting <br />Leandro is a utility coordinator specializing in utility coordination and conflict <br />resolution for transportation, stormwater, coastal, and water treatment <br />infrastructure projects across South Florida. He oversees utility relocation <br />efforts for FDOT, municipal agencies, and design-build teams, ensuring utility <br />adjustments align with roadway, drainage, and structural improvements while <br />maintaining service continuity. He coordinates with Utility/Agency Owners <br />(UAOs), design teams, and contractors to mitigate conflicts involving water, <br />sewer, electrical, communications, and private systems across constrained <br />urban corridors, and prepares Utility Certification packages. Leandro also <br />provides permitting coordination services, including preapplication meetings <br />with agencies such as FDEP, MDC-RER, and local building departments. He <br />is committed to early, proactive coordination that keeps public infrastructure <br />projects on schedule and in compliance. <br />City of Fort Lauderdale, Riverwalk North Seawall Replacement Project <br />Utility Coordinator overseeing utility relocations and conflict resolutions for <br />replacement of the Riverwalk North seawall extending west from the Andrews <br />Avenue bridge toward the FEC train tracks. Leandro coordinated with UAOs to <br />relocate utilities attached to the existing concrete catwalk and replace utility <br />stations and electrical shore-tie pedestals, aligned utility adjustments with <br />new sheet piling and fixed and floating docks, supported existing-conditions <br />review and identification of deteriorated structural elements, and provided <br />post-design support reviewing shop drawings and submittals. City of Fort <br />Lauderdale Project No.: P. <br />Location: Fort Lauderdale, FL. Reference: Ana Ziegler, EE/PM II, aziegler@ <br />fortlauderdale.gov. <br />City of Homestead, East Avenue Drainage Improvements Project <br />Utility Coordinator managing utility coordination for roadway widening along Mowry Drive and East Avenue with <br />curb and gutter, sidewalk, a multiuse path, a raised median, drainage improvements, S&PM, signalization, and <br />lighting, all meeting current ADA and FDOT standards within existing City-owned right-of-way. Leandro emailed <br />and filed utility contact letters and requested markups, as-builts, No Conflict Letters, Utility Disposition Forms <br />(UDFs), and Utility Work Schedules (UWSs) from UAOs with follow-up. <br />Location: Hialeah, FL. Reference: Cairo Cangas, ccangas@homesteadfl.gov. <br />City of Miami Department of Resilience and Public Works, Raised Intersection at NW Terrace and NW <br />Avenue <br />Utility Coordinator managing utility coordination for design of a raised intersection traffic-calming device, including <br />roadway reconstruction, Milling and Resurfacing (M&R), sidewalks, curb and gutter, interlocking paver crosswalks, <br />drainage adjustments and new structures, pavement marking, and signage. Leandro created the Sunshine design <br />ticket and map and coordinated with UAOs to secure markups, as-builts, UDFs, and UWSs for Utility Certification. <br />Location: Miami, FL. Reference: Lidia Duardo, PE, lduardo@miamigov.com. <br />8 Years of <br />Experience <br />Education <br />B.A. in English, Florida <br />International University <br />(06/1987) <br />Expertise <br />Utility coordination, <br />conflict resolution, <br />permitting coordination, <br />UAO coordination, Utility <br />Certification, stormwater <br />and coastal infrastructure, <br />water and roadway <br />coordination