HBC Engineering Company | 125
<br />* Ohio Department of Transportation (ODOT), Office of Planning, Statewide Pedestrian Safety
<br />Improvement Program (PSIP)
<br />As design phase lead, Rami directed a team of more than ten professionals to develop Ohio's inaugural Pedestrian
<br />Safety Improvement Program, implementing improvements across 8 cities at 528 locations. He reviewed
<br />applications, conducted desktop and field reviews, estimated construction costs, and guided cities on selecting
<br />countermeasures including curb bump-outs, curb ramps, RRFBs, PHBs, signing and pavement marking, and
<br />lighting, with many non-standard sites requiring innovative solutions.
<br />Location: OH. Dates: 05/2020-1/2021.
<br />* Pace Suburban Bus / Regional Transportation Authority, Transit Signal Priority Integration
<br />Rami contributed to development of a regional Transit Signal Priority system, coordinating requirements for more
<br />than 300 intersections across IDOT, Cook County, Lake County, and the City of Chicago. He performed traffic
<br />signal design tasks, supported project management, and prepared documentation for the proof-of-concept and
<br />implementation phases, helping advance the first interoperable TSP framework under the Regional Transportation
<br />Authority.
<br />Location: Chicago, IL. Dates: 4/2021-6/2024.
<br />* Illinois Tollway, Tri-State Tollway Permanent Intelligent Transportation Design
<br />Rami supported network and communications design for deployment of ITS equipment along the I-294
<br />reconstruction and widening project. The work included development of a robust and redundant fiber backbone,
<br />installation of permanent ITS elements such as Active Traffic Management, CCTV cameras, Dynamic Message
<br />Signs, weather sensors, and Weigh-in-Motion stations, and coordination across multiple roadway design sections
<br />under aggressive timeframes.
<br />Location: Cook and DuPage Counties, IL. Dates: 4/2021-6/2024.
<br />* Chicago Department of Transportation / Chicago Transit Authority, Ashland Avenue Interconnect
<br />Rami supported traffic signal design for this modernization and fiber interconnect program combining Chicago
<br />Department of Transportation and Chicago Transit Authority work along the Ashland Avenue corridor. The project
<br />modernized 88 traffic signals, created a new fiber optic backbone for both agencies, and enabled Transit Signal
<br />Priority operations; Rami contributed to the fiber network design, permitting plans, and TSP integration across the
<br />corridor.
<br />Location: Chicago, IL. Dates: 4/2021-Present.
<br />* City of Wilmington, Downtown Pedestrian Safety Study
<br />As a traffic engineer, Rami performed the safety analysis and report preparation for this downtown pedestrian
<br />safety study aimed at improving motorist, pedestrian, and bicyclist safety and reducing crashes along US-68 and
<br />Main Street. He provided client management and presented findings and countermeasures, and supported a
<br />Highway Safety Improvement Program (HSIP) application that secured $0.72 million for design and construction.
<br />Recommendations included removing unwarranted signals, upgrading remaining signals, converting a signal to a
<br />roundabout, improving signal visibility, and modifying signal phasing and lane channelization.
<br />Location: Wilmington, OH. Dates: 05/2019-6/2020.
<br />Rami Hanna, PE
|