Laserfiche WebLink
HBC Engineering Company | 144 <br />FDOT District 6, Districtwide Traffic Operations Studies Consultant – Travel Time Validation Analysis <br />Omar conducted data collection tasks for this project effort, which involved performing a validation of travel time <br />accuracy of information published on Dynamic Message Signs through the FLATIS system. Travel time and delay <br />data was collected across 24 Travel Time Links using Miovision Scout equipment via MAC address capture. Field- <br />collected data was compared to SunGuide travel time data in 15-minute intervals for peak, off-peak, accident, <br />and rain conditions for AM and PM periods, and then compared to travel time ranges to determine overestimated, <br />underestimated, or matching travel time. Recommendations were subsequently developed on a segment-by- <br />segment basis. <br />Location: Miami-Dade County, FL. Dates: 4/2025–7/2025. Contract No.: CA961. FM No.: 409521-7-32-01. Reference: <br />Diana Iglesias, (954) 535-5153, Diana.Iglesias@dot.state.fl.us. <br />FDOT District 4, Districtwide Traffic Operations Data Collection <br />Omar is performing data collection activities for this contract, in which HBC is conducting routine traffic data <br />collection activities for FDOT District 4 on a Task Work Order (TWO) basis. The project tasks include collecting <br />Turning Movement Counts (TMCs), spot speed and speed profile data, volume and classification counts, pedestrian <br />and bicycle data, and travel time and delay data, as well as assisting the District with miscellaneous data collection <br />and traffic studies. <br />Location: FDOT District 4. Dates: Ongoing. Contract No.: CAU65. FM No.: 230026-6-32-01. HBC Fee: $1.5M. <br />Reference: Ysamary Vergara, (954) 777-4380, Ysamary.Vergara@dot.state.fl.us. <br />Palm Beach County (PBC), Cherry Rd from Military Trail to Quail Dr Roadway, Sidewalk, and Pedestrian <br />Lighting Improvements LAP Project <br />This project involves the construction of an 8’ wide sidewalk along the north side of Cherry Road from N. Military <br />Trail to a point 120’ west of Quail Drive. Additionally, a 6’ wide sidewalk will be constructed on the south side of <br />Cherry Road, covering the same stretch from N. Military Trail to Quail Road, with the exception of the segment that <br />crosses Bridge No. 934229. The scope also includes Milling and Resurfacing (M&R), widening, and the installation <br />of appropriate Signing and Pavement Markings (S&PMs) to better accommodate current traffic volumes and <br />improve overall traffic flow. Pedestrian-scale lighting and landscaping will be installed along the sidewalks and <br />in key areas of the roadway. Omar was the Construction Engineering and Inspection (CEI) inspector responsible <br />for daily reports, photo documentation, Maintenance of Traffic (MOT) and Stormwater Pollution Prevention Plan <br />(SWPPP) checks, biweekly meetings, and gathering onsite information to aid with any change orders and Requests <br />for Information (RFIs). <br />Location: Palm Beach County, FL. Dates: 03/2025–Ongoing. Contract No.: 2021025. Construction Fees: $1.2M. <br />Reference: Dave West, (561) 684-4180, DWest1@pbc.gov. <br />FDOT District 4, CEI Services for Complete Streets Improvements along Boynton Beach Blvd between NW <br />3rd St and US-1/Federal Hwy <br />Construction Engineering and Inspection (CEI) Inspector Aide overseeing the improvements under this contract, <br />which consist of, but are not limited to, Maintenance of Traffic (MOT) (standard, special, traffic control officer), <br />erosion control (sediment barrier, inlet protection), concrete (removal, gravity wall, curb, gutter, sidewalk, driveways), <br />asphalt (milling, base, Superpave, friction course), lighting (luminaires), pavement markings (detectable, painted), <br />signalization (signal cable, aluminum pole, signal auxiliaries, vehicular signal and detection, pedestrian signal and <br />detection, loop detector, loop assembly), Signing and Pavement Marking (S&PM) (single-post, raised, painted, <br />thermoplastic, bike lane, sharrow), traffic monitoring (sensor, loop, cabinet), conduit, pull/splice box, and utility <br />adjustments (manhole, valve meter box) along SR-804/Boynton Beach Blvd from NW 3rd St to US-1/Federal Hwy, <br />for 0.659 miles in the City of Boynton Beach in Palm Beach County, FL. Omar’s responsibilities included <br />Omar Sosa