|
HBC Engineering Company | 143
<br />Omar Sosa
<br />CEI Inspector
<br />Omar has made strides with significant experience working in the
<br />Construction Engineering and Inspection (CEI) industry as a CEI Inspector.
<br />Omar has provided Verification Testing (VT) in the field of asphalt, where
<br />he aided in performing asphalt coring, soil testing, sampling, and has
<br />gained experience with Milling and Resurfacing (M&R), road rehabilitation,
<br />and maintenance techniques. His proficiency also extends to a range of
<br />other construction activities, including earthwork, Maintenance of Traffic
<br />(MOT), clearing and grubbing, sediment barrier installation, drainage
<br />systems implementation, regular excavation, guardrail installation, lighting,
<br />signalization, the application of Signing and Pavement Markings (S&PMs),
<br />and concrete coring, testing, and sampling. Omar’s premiere experience was
<br />on the FDOT District 4 Boynton Beach project, which was completed with a
<br />6-month acceleration and won a Best in Construction MOT Award from the
<br />Florida Transportation Builders’ Association (FTBA). During his time on this
<br />contract, he gained exposure to signalized intersection inspections, including
<br />signal components such as mast arms, controller cabinets, conduit, and pull
<br />boxes, supporting verification of installation against FDOT standards. During
<br />his time in this role, Omar gained experience maintaining logbooks, testing,
<br />and sampling concrete. His professionalism and dedication have enabled
<br />him to rapidly grasp essential programs, such as PrC and MAC, and gain
<br />an intimate understanding of Florida Department of Transportation (FDOT)
<br />Standards and Specifications and MOT.
<br />Broward County, CEI Services for West Hillsboro Blvd Improvements.
<br />Construction Engineering and Inspection (CEI) Inspector for this NW 64th
<br />Terrace/NW 74th Place/West Hillsboro Boulevard Intersection Improvements
<br />Project, which involves the construction of new bike lanes, installation of
<br />street lighting, development of a roundabout at the NW 64th Terrace/NW
<br />74th Place/West Hillsboro Boulevard intersection, as well as Milling and
<br />Resurfacing (M&R) the existing roadway, sidewalk enhancements, intersection
<br />improvements including signalization, and ADA compliance improvements.
<br />Max oversees daily construction activities to ensure adherence to project
<br />plans, specifications, and safety standards. He conducts inspections of
<br />materials and workmanship, verifying the proper installation of bike lanes,
<br />lighting, and roundabout components. His responsibilities include maintaining
<br />detailed records of inspections, test results, and any issues encountered
<br />during construction. He monitors project progress, tracks milestones, and
<br />reports on any delays or deviations from the schedule. Ensuring that all
<br />sidewalk and ADA improvements meet current standards and specifications
<br />is a critical part of his role.
<br />Location: Jacksonville, FL. Dates: 10/2022–06/2024.
<br />2 Years of
<br />Experience
<br />Years with HBC
<br />2 years
<br />Education
<br />A.S. in Civil Engineering,
<br />Broward College (2024)
<br />Registration(s)
<br />FDOT CTQP Trainee ID:
<br />1000005998
<br />Licenses & Certifications
<br />FDOT CTQPs:
<br />Earthwork Construction
<br />Inspection Level 1
<br />FDOT Concrete Field
<br />Technician Level 1
<br />Hazmat/Nuclear Gauge
<br />Safety Certification
<br />Asphalt Paving Level 1 (In
<br />Progress)
<br />Nuclear Hazmat / Troxler
<br />Certification
<br />Advanced MOT Certified
<br />ACI Level 1
<br />Microsoft Office
<br />Knowledge of: PrC, MAC,
<br />PSSP, LCNS
|