Laserfiche WebLink
HBC Engineering Company | 154 <br />Fernando Craveiro de Sa, PhD <br />Grant Writing <br />Dr. Craveiro has extensive experience in civil engineering, client service <br />management, constructability reviews, area management, and business <br />development. He has worked on large infrastructure projects involving various <br />disciplines, such as transportation, traffic, water, wastewater, coastal, ports, <br />and marine. His typical client interface is with agencies, including Miami- <br />Dade County Water and Sewer Department (MDC-WASD) and South Florida <br />Water Management District (SFWMD), as well as companies like Vale and <br />Petrobras. From a technical standpoint, he has been involved in a wide <br />variety of complex and high-profile infrastructure projects. He has performed <br />various technical roles successfully, including those dealing with planning, <br />conceptual design, and evaluation of existing systems. <br />Broward County, Septic Tank Elimination Program (STEP). <br />Quality Assurance/Quality Control (QA/QC) Reviewer for this project, which <br />included the evaluation and selection of 3 alternative sewer systems to serve <br />the business properties located within a marina in Broward County. Other <br />services included site evaluation, site investigations, coordination with <br />municipalities and property owners, hydraulic analysis, lift station design, <br />and preparation of the inventory of existing and proposed utility easements. <br />Location: Broward County, FL. Dates: 2019–2021. Reference: Alicia Dunne, PE, <br />(954) 831-0793, adunne@broward.org. Project No.: 104247. <br />MDC-WASD, CD 2.27: Central District Wastewater Treatment Plant <br />(CDWWTP) New Oxygen Plant Design-Build Project. <br />Quality Assurance/Quality Control (QA/QC) Reviewer for this project, which <br />involved the construction of an oxygen production system (2-VPSA) at the <br />CDWWTP to provide full redundancy, as the existing units were near the end <br />of their useful service life and prone to failure. <br />Location: Virginia Key, FL. Dates: 2016–2020. HBC Fee: $150K. Construction <br />Cost: $58M. Reference: Paul F. Adams, (786) 863-9425, paul.adams@ <br />miamidade.gov. <br />*MDC-WASD, South District Wastewater Treatment Plant (SDWWTP) <br />Renewal and Replacement Project. <br />Client Service Manager responsible for quality control and allocation of <br />appropriate technical resources. Fernando also served as Senior Technical <br />Consultant on several issues, including large sewage pumps, screening and <br />grit removal and disposal system, primary clarification and scum handling, <br />sludge thickening, co-generation, pure oxygen biological secondary system, <br />high-level disinfection, effluent filtration, wastewater reuse, deep well <br />injection, and operator training. <br />Location: Cutler Bay, FL. Dates: 7/2007-11/2009. Reference: Humberto <br />47 Years of <br />Experience <br />Years with HBC <br />9 years <br />Education <br />PhD in Civil Engineering/ <br />Environmental, University <br />of Texas at Austin <br />(5/18/1991) <br />M.S. in Civil Engineering/ <br />Environmental, University <br />of Texas at Austin <br />(5/18/1985) <br />M.S. in Hydraulic and <br />Environmental Engineering, <br />IHE Delft, Holland <br />(9/11/1982) <br />Industrial Environmental <br />Engineering, Fundçãao <br />Armando Alvarez Penteado, <br />Brazil (1980) <br />B.S. in Civil Engineering, <br />Universidade de São Paulo, <br />Brazil (11/9/1979) <br />Licenses & Certifications <br />Engineer Intern (TX) <br />(01/02/1991) <br />Executive Leadership, <br />Michigan University <br />(2001) <br />Expertise <br />Water and wastewater <br />infrastructure, civil <br />engineering, environmental