Laserfiche WebLink
HBC Engineering Company | 155 <br />Codispoti, (305) 790-0235, HCP@miamidade.gov. <br />*MDC-WASD, Master Plan Update. <br />Client Service Manager responsible for his portion (30%) of the contract’s <br />performance and technical resources. He also served as Senior Technical <br />Consultant and expert in water reuse and the mitigation of Emerging Pollutants <br />of Concern. The engineering services were mostly related to Sustainability <br />and Resiliency, given the strong considerations for wastewater reuse. The <br />team was successful in obtaining MDC-WASD’s 20-year Water Use Permit, <br />which allows MDC to manage its water resources and the treatment and <br />reuse of its wastewater. <br />Location: Miami-Dade County, FL. Dates: 5/2005-10/2008. Contract Amount: <br />$4M. Reference: Victor Pujals, (305) 372-7171, PujalsVJ@cdm.com. <br />*City of Miami Beach Public Works, Sunset Harbour Pressurized Drainage Wells Project. <br />Client Service Manager responsible for the overall contract performance, including the management of budget, <br />schedule, and client contact. He coordinated all activities between client, project manager, contractors, <br />subcontractors, and internal company resources. This project included the detailed design of pressurized injection <br />wells to treat and dispose of stormwater runoff. The final design included developing mechanical and yard piping <br />drawings and mechanical design calculations. He also provided QA/QC reviews of all deliverables. <br />Location: Miami Beach, FL. <br />*City of Miami Beach Capital Improvement Office, Normandy Shores Right-of-Way (ROW) Improvement <br />Program. <br />Project Manager and Client Service Manager responsible for the overall contract performance, including the <br />management of budget, schedule, and contact with the client. He coordinated all activities between client, <br />contractors, subcontractors, and internal company resources. This Normandy Shores Right-of-Way Capital <br />Improvement Project (CIP) included a variety of streetscape and stormwater upgrades. <br />Location: Miami Beach, FL. <br />Puerto Rico Aqueduct and Sewer Authority (PRASA), El Yunque (Las Picuas) WWTP Elimination. <br />Senior Technical Advisor and Quality Control that is providing technical oversight and quality review for the El Yunque <br />(Las Picúas) WWTP Elimination project for PRASA, a 90% design effort to upgrade sanitary infrastructure for the <br />Las Picúas community. Responsibilities included reviewing the design of two new sanitary pump stations, sanitary <br />force mains, air release and vacuum valves, and utility integration measures to support reliable conveyance to the <br />Palmer Pump Station. The role also included quality control review of demolition and transition planning for the <br />existing WWTP, site grading, stormwater management, access roads, sidewalks, parking areas, fencing, gates, <br />erosion and sedimentation controls, and permit documentation. Additional oversight included review of PRASA <br />pump station capacity evaluations and the sanitary force main analysis from Palmer SPS to the Fajardo Regional <br />WWTP to verify constructability, regulatory compliance, system reliability, and consistency with PRASA, local, <br />state, and federal requirements. <br />Location: Río Grande, Puerto Rico. Date: 2024-Ongoing. HBC Fee: $243,123. Reference: Adamaris J. Quiñones, PE, <br />Fernando Craveiro de Sa, PhD <br />engineering, project <br />management, Quality <br />Assurance/Quality Control <br />(QA/QC), feasibility <br />studies, drainage and flood <br />control, and transportation <br />infrastructure. <br />*Prior to HBC