<br />Frank Paruas, PSM Village of Pinecrest Basin C100DN-1W, Drainage Improvements, Phase 11, Village of Pinecrest, Miami-Dade County,
<br />FL.- Mr. Paruas served as Survey Project Manager for this project that included performing 3D Survey for this project using
<br />Terrestrial Mobile Lidar, the project included the following roads: SW 73rd Court from SW 104th Street to SW 96th Street. The
<br />3D Survey extended up to the existing buildings when the lidar data was available. GPI scope included setting and establishing
<br />horizontal and vertical values for the project Secondary Control (TML targets). GPI calibrated the point cloud the existing
<br />ground control TML and extracted the 3D Features along the corridor using TOPODOT. Final files were submitted on CIVIL3D.
<br />Village of Pinecrest: Contact: David J. Mendez, P.E., (305) 669-6916, Email: dmendez@pinecrest-fl.gov|
<br />FDOT SR 934/Normandy Drive from Rue Bordeaux Dr. to Rue Notre Dame, Miami, FL. Project Manager. GPI was asked to perform a 3D Survey for this corridor, that extended 5 feet beyond the existing R/W lines. Due to the elevated number of parked vehicles in this corridor, the 3D Survey was completed using Static Scanner. This project included the addition al mapping of the poor drainage areas. Mr. Paruas served as Project Manager, and his functions included establishing Horizontal and Vertical Control along the corridor, preparing the PC Sheets, coordinating the 3D extraction and preparing the final submittal. Client: Florida Department of Transportation-District 6. Contact: Zurelys C. Perez de Alejo, PSM, Ph.: (305)-640-7471, Email: Zurelys.PerezDeAlejo@dot.state.fl.us
<br />Parking Garage 6, Topographic Survey, Miami-Dade Aviation Department (MDAD), Miami International Airport (MIA, Miami-Dade County, FL. Dates of Service: 2019-2021 Mr. Paruas, served as the Survey Project Manager for this significant project with Miami International Airport. The project scope included a complete 3D Topographic Survey for the design phase of the New Parking Garage Six, within MIA Premises. The 3D Survey was completed using Terrestrial Static LiDAR combined with Traditional Survey methods. Mr. Paruas, lead the setting of primary control points, on NAD 83/2011, and NAVD88 Datum and prepared a complete 3D Survey with elevations at 25 feet interval. Additionally, the scope included drainage investigation. Mr.
<br />Paruas also supported the underground investigation completed by others. Miami-Dade Aviation Department (MDAD)
<br />Contact: Jose Requejo, RA, ID, LEED AP, Ph. 305-869-3303, Email: JRequejo@FlyMIA.com
<br />MIC Passenger Remote Parking Lot and TNC Relocation, Topographic Survey, Miami-Dade Aviation Department (MDAD),
<br />Miami International Airport (MIA), Miami-Dade County, FL Dates of Service: 2023-2024. Mr. Paruas served as the Survey Project Manager for this project with Miami International Airport within the MIC area. The project scope included a complete 3D Topographic Survey for the design phase of the parking improvements. The 3D Survey was completed using Terrestrial Mobile LiDAR for the public road areas, including NW 37th Ave, NW 21st Street and NW 25th Street, and combined with traditional survey for the existing underdeveloped parking lot. The scope included establishing primary control on NAD 83/2011, and
<br />NAVD88 Datum, drainage survey, underground utility investigation and (SUE) completed by others. The scope also included performing a Boundary Survey of the MDAD owned parcel. Miami-Dade Aviation Department (MDAD) Contact: Ricardo
<br />Lopez, P.E., Construction Manager, Ph. 305-869-3480, Email: RLopez@flyMIA.com
<br />AB-016A Perimeter Security Hardening Ph-1, Topographic Survey, Miami-Dade Aviation Department (MDAD), Miami International Airport (MIA), Miami-Dade County, FL. Dates of Service: 2024-2025. Mr. Paruas served as the Survey Project
<br />Manager for this Topographic Survey performed along the southern perimeter of Miami-International Airport. The purpose of this project was surveying the existing conditions of the perimeter road. The Survey was completed using Aerial LiDAR, combined with traditional Survey. This scope included field efforts both on landside and airside. The scope included establishing primary control on NAD 83/2011, and NAVD88 Datum, drainage survey, underground utility investigation (SUE) completed by others. The scope also included performing a Boundary Survey of the MDAD owned parcel.
<br />Miami-Dade Aviation Department (MDAD). Contact: Leslie Livesay, Construction Manager 3, Ph: (305) 869-5819 Email:
<br />LLivesay@FlyMIA.com
<br />Primary Control for All Five MDAD Airport. Mr. Paruas served as Survey Project Manager for this effort that included establishing primary Horizontal and Vertical Control
<br />for all Five MDAD Owned Airports (MIA, Opa-Locka Executive, Kendall-Tamiami Executive, Miami-Homestead General Aviation (X-51) and Dade-Collier Training and Transition Airport). Under this effort, control points were set and horizontal and vertical values were established by performing static observations and closed level loops. The Horizontal values were established on North American Datum of 1983, adjustment 2011 (NAD83/11) and the elevations were established in Norh American Vertical Datum of 1988 (NAVD88)