Laserfiche WebLink
HBC Engineering Company | 162 <br />15 Years with KCI <br />30 Total Years <br />of Experience <br />Mr. Mohler brings over three decades of project experience in parks, streetscapes, hospitality, PUDs, and <br />commercial development. Professional services frequently include initial data collection and observation, <br />site analysis, concept and design development, and complete site, landscape, and irrigation design, <br />including construction oversight and inspection services. Previously, Mr. Mohler designed, tested, <br />inspected, and managed central control irrigation systems. His thorough understanding of water, soils, <br />and plants within the built environment afforded him decades of successful consulting career in the <br />private sector, including irrigation water management through advanced technologies like soil moisture <br />sensing, weather stations, and computerized central control systems. <br />Project Experience <br />5th Street Play Spot, Miami-Dade County. Miami, FL. Senior Landscape <br />Architect. KCI prepared design development drawings and is working <br />on the construction documents related to implementing improvements <br />to this park site in a dense urban area. KCI performed site analysis <br />and inventory, created concept designs and budgeting, and worked <br />with Miami-Dade County Parks, Recreation, and Open Spaces to <br />realize their vision. The programmed elements include a nature-based <br />playground (ages 2-5 and 5-12), hardscape improvements, site lighting, <br />park site amenities (benches, trash cans, dog waste stations), walkway <br />through the site, landscape improvements, irrigation system, entrance <br />improvements, and fencing. <br />Lyons Road Phase V, City of Coconut Creek. Coconut Creek, FL. <br />Landscape Architect. KCI developed a master plan for the enhancement <br />of a seven-mile corridor project. This initiative included the development <br />of a cohesive landscape and hardscape design, gateway enhancements <br />at major intersections, and the realignment of sidewalks. KCI also <br />produced design and construction drawings for all phases of the project, <br />which featured improvements in median landscaping, hardscaping, and <br />irrigation. Spanning from Atlantic Boulevard to Coconut Creek Parkway, <br />this stretch was the final section of the master plan. The project involved <br />landscaping, hardscaping, irrigation, and obtaining the necessary permits <br />through Broward County. <br />Loxahatchee Environmental Engagement Campus, Loxahatchee River Environmental Control District. Jupiter, FL. <br />Project Manager. KCI provided master site planning services to the Loxahatchee River Environmental Control District <br />(LRECD) for this 20-acre site. KCI performed site analysis and inventory, created concept designs and budgeting, and <br />worked with LRECD to realize a master plan capturing their vision. The master plan for the Environmental Engagement <br />Campus showcases the function of the LRECD within the unique local environment, including the Loxahatchee River, and <br />the stewardship of which is the focus of LRECD’s mission. <br />Washington Park, City of North Miami Beach. North Miami Beach, FL. Project Manager. KCI is providing professional <br />landscape architectural, civil, and survey services to the City of North Miami Beach in support of the complete replacement <br />of Washington Park. The park is located in the City’s historic neighborhood of the same name. The park will include a <br />community center, pool and splashpad, playground, covered basketball courts, restrooms, parking, multi-purpose field, <br />landscape, and irrigation. Retrofitting of sidewalks and play areas were designed for ADA compliance. <br />Hillsboro El Rio Park, Phase II, City of Boca Raton. Boca Raton, FL. Project Manager. KCI provided professional <br />landscape architecture, engineering, survey, and environmental services to the City of Boca Raton for the design and <br />site plan approval of a 17-acre park. The Park features include entry signage, a grand pavilion and restroom, large and <br />small pavilions with grills, a fitness path, large passive recreation areas, a non-motorized boat launch, sport courts, a large <br />playground, shade structures, and a fitness station. Due to the site’s historical and past uses as a landfill, redevelopment <br />required stormwater permitting through FDEP. ICPR Version 4 was used to model the Master Drainage System. Stormwater <br />permitting submittals through FDEP were required, as was coordination with ACOE for wetland determination. <br />Certifications & Registrations <br />• RLA FL LA0001594 (1997) <br />• RLA GA 001610 (2010) <br />• RLA SC 1529 (2021) <br />• LAP Design Criteria, Specifications <br />& Construction Checklist <br />Training Certification <br />• Specifications Package Preparation <br />Training for Consultants <br />• FL Water Star Accredited Professional <br />• Certifier (FWS- AP) <br />• ISA Certified Arborist <br />Education <br />• BLA Landscape Architecture, <br />Clemson University <br />Todd Mohler, RLA, ISA, IA <br />Senior Landscape Architect <br />Fort Lauderdale, FL