Laserfiche WebLink
HBC Engineering Company | 19 <br />SR-817/University Dr from Nova Dr to SR-84 <br />Corridor Improvements Project <br />Florida Department of Transportation (FDOT) District 4 (D4) <br />This project involves a series of significant improvements along SR-817/ <br />University Drive from Nova Drive to SR-84. The key project enhancements <br />include widening pavement to accommodate a new auxiliary lane extending <br />from NW 23rd Street to the westbound I-595 ramps, improving traffic flow <br />and accessibility. Additionally, existing drainage structures, overhead <br />signs, a mast arm, and utility poles will be repositioned to support the road <br />modifications and ensure safety. <br />The bus stop bay at the northeast corner of Nova Drive and SR-817/University <br />Drive will be redesigned to enhance passenger access and operational <br />efficiency. Furthermore, adjustments will be made to the right-turning lanes <br />serving the Royal Grand community, PNC Bank, and Nova Drive, optimizing <br />traffic movement and reducing congestion in the area. <br />These improvements enhance traffic safety and efficiency, reduce delays, <br />and provide better public transport access along this crucial corridor. By <br />addressing infrastructure needs and reconfiguring existing layouts, the <br />project supports current and future traffic demands, while contributing to <br />the region’s overall development. <br />Location <br />Davie, FL <br />Dates <br />02/2022 - Ongoing <br />Budget <br />HBC Fee: $1.7M <br />Reference <br />Lance Jones, PE <br />(954) 777-4680 <br />lance.jones1@dot.state.fl.us <br />Key Components <br />Pavement widening, <br />drainage improvements, <br />sign relocation, mast <br />arm relocation, utility <br />pole relocation, bus <br />bay redesign, turn lane <br />adjustments, traffic flow <br />optimization, safety <br />enhancements, and transit <br />access improvements.