My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 33 <br />Hollywood Seminole Indian Reservation Pedestrian Bridge <br />Seminole Tribe of Florida (STOF) <br />HBC Engineering Company is providing comprehensive structural and civil <br />engineering services for the design of a new pedestrian bridge to safely <br />connect key areas within the Hollywood Seminole Indian Reservation across <br />SR-7. The bridge will enhance pedestrian mobility and community safety. The <br />scope includes: <br />• Structural analysis and schematic design of three bridge concepts <br />• Field investigations including topographic and boundary surveys, utility <br />locates, and geotechnical investigations <br />• Development of 30%, 90%, and 100% construction documents <br />• Coordination with STOF, FDOT, FHWA, and other regulatory <br />stakeholders <br />• Preparation of technical specifications, permit applications, and <br />stormwater design <br />• Support during the bid phase, including pre-bid assistance and <br />construction document conformance <br />• Optional services such as 3D renderings, drone video flyovers, and <br />virtual presentations <br />• Roadway set of plans is being developed as part of the design, <br />incorporating typical sections, cross-sections, signing and pavement <br />Location <br />Hollywood, FL <br />Dates <br />2025 -Ongoing <br />Budget <br />HBC Fee: $2.3M <br />Construction Cost: $3.5M <br />Reference <br />Omar Nunez <br />josenunez@semtribe.com <br />(954) 894-1060 <br />Contract No. <br />380349 <br />Key Components <br />Bridge schematic design, <br />stormwater design, <br />roadway plans, field <br />investigation, topographic <br />survey, utility location, <br />geotechnical investigation, <br />30% design development, <br />90% and 100% design <br />submittals,
The URL can be used to link to this page
Your browser does not support the video tag.