Laserfiche WebLink
HBC Engineering Company | 45 <br />CEI Services for the Sanitary Force Main Furnish <br />and Install (F&I) Project - Phase III <br />Miami-Dade County Water and Sewer Department (MDC-WASD) <br />HBC provided comprehensive Construction Engineering and Inspection <br />(CEI) services for the installation of more than 11,000 linear feet (LF) of <br />sanitary sewer force mains along West, North, and East Country Club Drive, <br />extending from William Lehman Causeway to Yacht Club Way. The force <br />main system primarily consisted of 16-inch diameter pipe, with additional <br />segments ranging from 20 inches to 4 inches in diameter to accommodate <br />varying project requirements and existing utility conditions. In addition <br />to the utility improvements, the project included roadway milling and <br />resurfacing of all northbound and southbound travel lanes along West, <br />North, and South Country Club Drive. Associated roadway enhancements <br />also encompassed the installation of thermoplastic pavement markings and <br />striping, illuminated pedestrian crosswalks to improve visibility and support <br />ADA compliance, and landscaping improvements to restore and enhance <br />the corridor’s overall appearance and functionality. <br />The HBC team is managing the inspection staff and overseeing daily <br />construction activities to ensure the contractor adheres to MDC-WASD <br />safety standards, specifications, and guidelines. Their duties include <br />reviewing and processing shop drawings, RFIs, and pay applications; <br />conducting bi-weekly meetings, necessary onsite meetings, and conflict <br />resolution meetings; maintaining well-kept records of all daily activities, <br />MOT, SWPPP, and weather reports; and coordinating with the contractor, <br />EOR, and client for design modifications. This includes creating a redundant <br />backup system for the City of Aventura instead of abandoning the existing <br />Location <br />Miami-Dade County, FL <br />Dates <br />05/2023 - Ongoing <br />Budget <br />HBC Fee: $4M <br />Reference <br />Miguel Pichardo <br />(786) 258-2573 <br />Miguel.Pichardo@ <br />miamidade.gov <br />Contract No. <br />PCTS 20080 <br />Key Components <br />Constuction engineering <br />inspection (CEI), sanitary <br />sewer force mains, daily <br />construction oversight, <br />safety standards