My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 44 <br />CEI Services for FDEP Grant Funded 12” Reclaimed <br />Water Main 2-Mile Expansion for Area 10 <br />City of Delray Beach <br />HBC provided full Construction Engineering and Inspection (CEI) services <br />for this complex, multiphased utility infrastructure project located <br />within the City of Delray Beach and funded by a Florida Department of <br />Environmental Protection (FDEP) Grant. Spanning two distinct phases and <br />covering various urban locations, this project included the installation of <br />over 7,500 linear feet of 12” and 6” diameter High-Density Polyethylene <br />(HDPE) water main using both Horizontal Directional Drilling (HDD) <br />and open cut methods. The scope also included the reconstruction of <br />sidewalks, driveway connections, pavement restoration, and coordination <br />with existing utilities throughout the corridor. A particularly critical <br />component of this project involved proactive coordination with the Florida <br />East Coast (FEC) Railway for the water main installation beneath the active <br />railway tracks. HBC’s CEI team, led by Christopher Soto, ensured the <br />precise documentation of daily construction activities, coordinated utility <br />adjustments, and managed contractor compliance with specifications <br />and permitting requirements. The team also conducted biweekly progress <br />meetings with the City and stakeholders to provide updates, resolve <br />issues proactively, and maintain quality control. Despite facing multiple <br />schedule setbacks, due to utility conflicts and unforeseen conditions, the <br />team maintained budget discipline, keeping the project under budget by <br />minimizing and negotiating change orders, avoiding cost overruns, and <br />maintaining alignment with the client’s objectives. <br />Location <br />Delray Beach, FL <br />Dates <br />2021 - 2024 <br />Budget <br />HBC Fee: $1.6M <br />Reference <br />Cynthia Buisson, PE <br />(561) 243-7196 <br />FuentesC mydelraybeach. <br />com <br />100 NW 1st Ave. <br />Delray Beach, FL 33444 <br />Key Components <br />CEI, HDPE water main, <br />Horizontal Directional <br />Drilling (HDD) installation, <br />FEC Railway coordination, <br />pavement and sidewalks, <br />and utility conflicts. <br />Funded by <br />Local Agency <br />Program (LAP)
The URL can be used to link to this page
Your browser does not support the video tag.