|
Geotechnical Engineering
<br />Raj Krishnasamy, PE | 39 |80% (TSF)
<br />Kumar Vedula, PE | 30 | 80% (TSF)
<br />Grant Writing
<br />Fernando Craveiro de Sa, PhD | 47 | 90%
<br />Fernando A. Vazquez, PE | 35 | 100%
<br />Public Involvement
<br />Dayana Sanjurjo | 20 | 100% (MRG)Gabriel Pons | 23 | 80%
<br />Ethan Behre | 8 | 80%
<br />Surveying & Mapping
<br />Abraham Hadad, PSM | 32 | 90% (HAD)
<br />Frank Paruas, PSM | 26 |90% (HAD)
<br />Mechanical, HVAC & Plumbing
<br />B. Shahnami, PE, CXA, LEED AP BD+C | 27 | 80% (SGM)
<br />John Stellpflug, PE | 41 | 80% (SGM)
<br />Hany Zareh, PE, CFPS| 26 | 80% (SGM)
<br />Architect
<br />Jose A. Vidal, AIA, LEED AP | 32 |100% (V3)
<br />Manuel D. Fernandez, AIA | 22 |100% (V3)
<br />Landscape Architect
<br />Todd Mohler, RLA, ISA, IA | 30 | 90% (KCI )
<br />Natalia Barranco, RLA |20 | 90% (KCI )
<br />Environmental/Coastal Engineering
<br />Manuel Castaño, PE, WEDG |13 |80% (M&N)
<br />SUPPORT SERVICES
<br />Civil Engineering General
<br />Jose Lopez, PE | 21 | 80%
<br />Teodoro Tefel, PE | 39 | 80%
<br />Alexander Tzenkov, EI | 3 | 90%
<br />Osmin Ocon, EI | 4 | 90%
<br />Roadway
<br />Jose Lopez, PE | 21 | 80%
<br />Teodoro Tefel, PE | 39 | 80%
<br />Alexander Tzenkov, EI | 3 | 90%
<br />Osmin Ocon, EI | 4 | 90%
<br />Drainage Engineering
<br />H. Lugo, MS, PE, CFM | 28 | 100%
<br />Adelbert Shaffer, PE | 22 | 100%
<br />Joseph Maceo, EI | 8 | 90%
<br />Derrek Okosun, EI | 6 | 90%
<br />Y. Navarro Sanchez, EI | 4 | 90%
<br />Water Resources
<br />Adelbert Shaffer, PE | 22 | 100%
<br />Joseph Maceo, EI | 8 | 90%
<br />Y. Navarro Sanchez, EI | 4 | 90%
<br />Structural Engineering
<br />Bunrith Heng, MS, PE| 32 | 90%
<br />Sonny Abia, PhD, PE | 35 | 80%
<br />Feng Liu, PE | 30 | 80% (EAC)
<br />Chun Li, PE | 34 | 80% (EAC)
<br />Signalization Engineering
<br />Gonzalo Barrera, PE | 7 | 80%
<br />Osmin Ocon, EI | 4 | 90%
<br />Signing, Pavement Marking
<br />and Channelization
<br />C. Bustamante, MS, PE | 22 | 80%
<br />Ynaja Juste, EI | 10 | 90%
<br />Feasibility and
<br />Engineering Reports
<br />Adebayo Coker, PE | 34| 80%
<br />H. Lugo, MS, PE, CFM | 28 |100%
<br />Utility Coordination & Permitting
<br />Sonny Abia, PhD, PE | 35 | 80%
<br />Leandro Vazquez | 8 | 90%
<br />Cost Estimation &
<br />Project Controls
<br />Joseph Williams | 38 | 90%
<br />GIS Analyst
<br />Julia Beliz, EI| 4 | 80%
<br />Y. Navarro Sanchez, EI | 4 | 90%
<br />Plans Review
<br />Teodoro Tefel, PE | 39 | 80%
<br />Sonny Abia, PhD, PE | 35 | 80%
<br />O. Penate, PE, IMSA III | 10 | 90%
<br />E. Diaz MS, PE, PSM | 37 | 80%
<br />Sr. Project Engineer
<br />C. Soto, PE, RSO| 13 | 100%
<br />Project Administrator
<br />Robert Audette, PE | 32| 100%
<br />Contract Support Specialist
<br />R. Caceres, PE, IMSA I| 22 | 100%
<br />Resident Compliance Specialist
<br />Tamara Toledo Alonso| 20 | 80%
<br />Sr. Inspector
<br />Willie J. Barley Jr.| 18 | 100%
<br />Luis Membreno| 18 | 100%
<br />Inspector
<br />Max Fernandez| 16 | 100%
<br />J. McGuinness, IMSA I | 11 | 100%
<br />Omar Sosa | 2 | 100%
<br />Material Testing
<br />Caridad Murphy| 33 | 80% (DMA)
<br />Liana Lantigua Cuni|10 | 80% (DMA)
<br />Transportation/Transit/
<br />Traffic Engineering
<br />M. Saad, PhD, PE, PTOE, IMSA II | 14 | 90%
<br />Jeremy Braithwaite, IMSA II | 9 | 90%
<br />Gabriel A. Evilla Cano, MS | 5 | 90%
<br />Multimodal Planning
<br />M. Saad, PhD, PE, PTOE, IMSA II | 14 | 90%
<br />ITS
<br />D. Rodriguez, MS, PE, IMSA III | 11 | 90%
<br />Henry Casanova, EE| 1 | 90%
<br />Maintenance of Traffic (MOT)
<br />Teodoro Tefel, PE | 39 | 80%
<br />David Coker, EI, IMSA I | 8 | 90%
<br />Data Collection
<br />Jeremy Braithwaite, IMSA II | 9 | 90%
<br />Gabriel A. Evilla Cano, MS | 5 | 90%
<br />EV Infrastructure Planning
<br />D. Rodriguez, MS, PE, IMSA III | 11 | 90%
<br />Rami Hanna, PE | 8 | 90%
<br />Electrical Engineers
<br />Orlando Penate, PE, IMSA III |20 | 90%
<br />Maikel Fiallo Nunez, PE | 25 | 90%
<br />Javier Gil, EE| 7| 90%
<br />Hermes Mateo, EI | 3 | 90%
<br />ORGANIZATIONAL CHART
<br />RFQ # 26-07-01: City of Sunny Isles Beach
<br />CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING
<br />CONSULTING SERVICES (CCNA)
<br />LEGEND
<br />HBC Engineering Company | HBC (DBE/SBE/MBE)
<br />EAC Consulting, Inc. | EAC
<br />HADONNE CORP | HC
<br />KCI Technologies, Inc. | KCI
<br />Moffatt &Nichol, Inc. | M&N
<br />SGM Engineering, Inc. | SGM
<br />Tierra South Florida, Inc. | TSF
<br />V3 Architectural Group, Inc. | V3
<br />Diaz-Murphy and Associates CES, LLC | DMA
<br />Media Relations Group, LLC | MRG
<br />% = Avabiliabilty
<br />In
<br />association
<br />with
<br />GENERAL CIVIL ENGINEERING TRANSPORTATION / TRANSIT / TRAFFIC ENGINEERING
<br />CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES
<br />Adebayo Coker, PE
<br />34 | 80%
<br />PRINCIPAL-IN-CHARGE
<br />Hernan Lugo, MS, PE CFM
<br />28 | 100%
<br />DEPUTY PROJECT MANAGER
<br />Edgar Diaz, MS, PE, PSM
<br />Exp. 33 | 80%
<br />QUALITY ASSURANCE/QUALITY CONTROL
<br />Christopher Soto, PE, RSO
<br />Exp. 13 | 80%
<br />CONSTRUCTABILITY REVIEWER
<br />ELECTRICAL ENGINEERING
<br />Fernando A. Vazquez, PE
<br />35 | 100%
<br />PROJECT MANAGER
<br />LEADJose Lopez
<br />LEADMoatz Saad
<br />LEADChris Soto
<br />LEADOrlando Penate
|