Laserfiche WebLink
HBC Engineering Company | 54 <br />Fernando A. Vazquez, PE <br />Project Manager <br />HBC is proud to designate Fernando A. Vazquez, PE, as Project <br />Manager for the City of Sunny Isles Beach Continuing Professional <br />Architectural and Engineering Consulting Services contract. Fernando <br />brings 40 years of executive, technical, and project management <br />experience delivering municipal infrastructure and capital <br />improvement programs throughout Florida, the United States, Latin <br />America, and Europe. His experience includes water, wastewater, <br />stormwater, roadway drainage, coastal resilience, pump stations, <br />force mains, pipelines, treatment facilities, permitting, grant funded <br />programs, and construction administration. <br /> <br />Fernando’s background is particularly relevant to Sunny Isles <br />Beach’s need for responsive, multidisciplinary services delivered <br />through individual task orders. As former City Engineer for the City <br />of Miami Beach, he directed major programs involving a 25 MGD <br />regional sewage pump station, a 54 inch force main, stormwater <br />master planning, flood mitigation, utility upgrades, and regulatory <br />coordination within highly urbanized and coastal environments. <br /> <br />As Project Manager, Fernando will serve as the City’s primary point of contact from task order development <br />through design, permitting, bidding, construction administration, and closeout. He will define scope, <br />schedule, budget, deliverables, and staffing needs while coordinating HBC’s civil, utility, transportation, <br />electrical, structural, mechanical, survey, environmental, coastal, geotechnical, and CEI professionals. <br /> <br />Fernando will lead reviews at the 30, 60, 90, and 100 percent design stages, monitor schedules and budgets, <br />coordinate agency approvals, and confirm consistency among plans, specifications, cost estimates, permits, <br />and bid documents. His management approach will provide clear accountability, timely communication, and <br />reliable access to qualified personnel throughout the contract. <br />Representative Project Experience <br />• City of Miami Beach Water and Wastewater Capital Improvement Program <br />• 25 MGD Regional Raw Sewage Pump Station and 54 Inch Force Main <br />• Sea Level Rise Integrated Stormwater Master Plan <br />• 4 8 Inch Microtunnel Sewer Interceptor <br />• City of Miami Beach Water and Wastewater Master Plans <br />Fernando’s leadership will provide the City with responsive management, multidisciplinary <br />coordination, disciplined cost and schedule control, and technically sound delivery from initial study <br />through construction closeout.