Laserfiche WebLink
HBC Engineering Company | 66 <br />Adebayo Coker, PE <br />Principal-In-Charge <br />Adebayo is a Florida-registered Professional Engineer and firm principal with <br />34 years of multidisciplinary civil and transportation engineering experience, <br />including 20 years with HBC. As Principal-in-Charge, he provides executive <br />oversight, quality assurance, and client accountability across the full project <br />life cycle, from planning and feasibility through design, permitting, and <br />construction. His municipal and public-agency portfolio spans roadway and <br />drainage improvements, complete streets and multimodal mobility, street <br />and pedestrian lighting, traffic engineering and safety, and construction <br />administration for clients including Miami-Dade County, FDOT, and numerous <br />South Florida municipalities. He routinely directs multi-agency permitting <br />and coordination with Miami-Dade County, FDOT, FDEP, and SFWMD, and is <br />committed to responsive, value-conscious delivery for public-sector clients. <br />FDOT District 6, Districtwide Pedestrian Lighting Retrofits, SR-A1A/ <br />Collins Avenue <br />As Project Manager, Adebayo directed LED street and pedestrian lighting <br />retrofits along the coastal SR-A1A/Collins Avenue corridor, replacing High- <br />Pressure Sodium luminaires with LED luminaires at signalized intersections <br />and adding poles to meet roadway and pedestrian lighting criteria. Work <br />included point-by-point photometric analysis (AGi32), a full luminaire <br />inventory, Temporary Traffic Control Plans, roadway design, surveying, and <br />interdisciplinary and agency coordination, with express consideration of the <br />seaward Coastal Construction Control Line (CCCL). <br />Location: Miami-Dade County, FL. Dates: 2017-2021. Contract No.: C9S97. <br />Reference: Patrick Marchant, (305) 470-5299, patrick.marchant@dot.state. <br />fl.us. <br />City of Hollywood, Johnson Street Complete Streets PD&E Study (N 30th <br />Rd to N Dixie Hwy) <br />As Project Manager and Engineer of Record, Adebayo led evaluation of <br />alternatives to transform Johnson Street into a Complete Street within the <br />existing 40-foot right-of-way, incorporating new interconnected sidewalk, new <br />lighting, a new drainage system, new transit bus stops, and a reconstructed <br />two-lane roadway with a center turn lane. The grant-funded effort (City of <br />Hollywood and Broward County Mobility Advancement Program, coordinated <br />with Broward County, FDOT, and the RTA) prioritized mobility for all modes. <br />Location: Hollywood, FL. Dates: 03/2023-Ongoing. Contract No.: HOLL-038. <br />Reference: Luis Lopez, PE, (954) 921-3251, llopez@hollywoodfl.org. <br />FDOT District 4, SR-7/US-441 Transit Corridor Improvements (LAP) <br />As Project Manager, Adebayo managed grant-funded (Local Agency Program) <br />complete-streets improvements enhancing pedestrian, bicycle, and transit <br />connectivity along SR-7/US-441, including new sidewalk, 8 to 12-foot shared- <br />use paths connecting parks and neighborhoods, ADA curb ramps, pedestrian <br />34 Years of <br />Experience <br />Years with HBC <br />20 years <br />Education <br />B.S., Civil Engineering, <br />Florida International <br />University (1992) <br />Registration(s) <br />PE (FL) No. 55322 <br />Licenses & Certifications <br />CTQP Quality Control (QC) <br />Manager <br />3D Highway Engineering <br />(ORD 3D Modeling) <br />NEPA & Transportation <br />Decision-Making Process <br />(NHI) <br />Expertise <br />Roadway design <br />and reconstruction, <br />Drainage and stormwater <br />management, Complete <br />streets and multimodal <br />mobility, Street and <br />pedestrian lighting, Traffic <br />engineering and safety, <br />PD&E and feasibility <br />studies, Construction <br />cost estimating and <br />engineering reports, <br />CEI and construction <br />administration, Multi- <br />agency permitting, QA/QC