Laserfiche WebLink
HBC Engineering Company | 77 <br />Teodoro Tefel, PE <br />Roadway | Plans Review | MOT <br />Teodoro brings extensive experience across civil engineering projects involving <br />roadway design, having served as Support Engineer, Project Engineer, <br />Senior Roadway Engineer, and Engineer of Record with responsibility for <br />management and plans review. He has served as in-house consultant for <br />the review of design variations and exceptions for the FDOT District 6 Design <br />Office. Teodoro has significant expertise in Signing and Pavement Marking <br />plans, Maintenance of Traffic plans, Traffic Control Plans, and Temporary <br />Traffic Control Plans, as well as Preliminary Engineering Reports and contract <br />development. He has worked extensively with FDOT and local municipalities <br />on major roadway and drainage systems, ensuring regulatory compliance <br />and best engineering practices. He is committed to delivering innovative, <br />sustainable, and technically sound engineering solutions. <br />FDOT District 6, Districtwide Resurfacing Scoping Reports <br />As Engineer of Record, Teodoro leads preparation of districtwide resurfacing <br />scoping reports, analyzing existing conditions to determine deficiencies and <br />substantiate project purpose and need. He develops project alternatives to <br />satisfy identified corridor needs and evaluates transit and transportation <br />system improvement options. Deliverables include preliminary cost sections, <br />preliminary drainage analysis and plans, conceptual roadway plans, approved <br />typical section packages, and variances and exceptions sections. <br />Location: Miami-Dade County, FL. Dates: 2023-2026. Contract No.: CAN23. <br />FM No.: 250759-5-22-01. Reference: Md S Hossain, MS, EI, (305) 470-5342, <br />Md.Hossain@dot.state.fl.us. <br />MDC-WASD, MOT Control Plans for a New 16-inch Diameter Water Main <br />Along NW 37th Ave between NW 36th St and NW 82nd St <br />Teodoro served as Project Engineer designing a Temporary Traffic Control <br />Plan for the installation of 14,400 linear feet of a 16-inch diameter water main <br />along NW 37th Avenue from S.R. 948/NW 36th Street to NW 82nd Street. He <br />prepared lane closure analysis, summary of quantities, and precise TTCP <br />phases and plans to safely route traffic through work zones. He coordinated <br />with MDC-WASD, FDOT District 6, and stakeholders to secure feedback and <br />approval of the proposed design. <br />Location: Miami-Dade County, FL. Dates: 2020-2021. Reference: Arnelio <br />Alfonso, PE, (305) 592-7283, Aalfonso@apcte.com. <br />MDC-WASD, MOT Control Plans for a New 8-inch Diameter Gravity <br />Sewer Line Along NW 37th Ave between NW 36th St and NW 82nd St <br />Teodoro served as Project Engineer designing a Temporary Traffic Control <br />Plan for the installation of 26,860 linear feet of an 8-inch diameter gravity <br />sewer line along NW 37th Avenue and adjacent areas from NW 36th Street/ <br />S.R. 948 to NW 82nd Street. He prepared lane closure analysis, summary of quantities, and precise TTCP phases <br />and plans to safely facilitate traffic routing through work zones. He coordinated with MDC-WASD, FDOT District 6, <br />39 Years of <br />Experience <br />Years with HBC <br />6 years <br />Education <br />B.S. in Civil Engineering, <br />Florida International <br />University (1987) <br />Registration(s) <br />PE (FL) No. 50106 <br />(02/15/1996) <br />Licenses & Certifications <br />Advanced MOT <br />Expertise <br />Roadway design, <br />Maintenance of Traffic <br />(MOT), Traffic Control <br />Plans (TCPs), Signing <br />and Pavement Marking <br />(S&PM), plans review, <br />highway reconstruction, <br />Milling and Resurfacing <br />(M&R), interchange <br />design, roadway widening, <br />drainage analysis