Laserfiche WebLink
HBC Engineering Company | 83 <br />Adelbert Shaffer, PE <br />Drainage Engineering | Water Resources <br />Adelbert is an experienced civil engineer and project manager specializing <br />in water, wastewater, and site development projects. He brings a strong <br />background in master planning, hydraulic modeling, utility design, and <br />construction document preparation, with a track record spanning water <br />and sewer system expansions, pump stations, dredging, stormwater <br />infrastructure, and large-scale site developments. His Florida experience <br />includes leading water transmission main design for Miami-Dade County and <br />coordinating raw water improvements in the City of Riviera Beach. Licensed <br />as a professional engineer in Florida and five additional states, Adelbert <br />directs multidisciplinary teams and technical analyses to deliver reliable, <br />cost-effective infrastructure for public-sector clients. <br />Miami-Dade County Water and Sewer Department (MDC-WASD), Q16 <br />A&D Small Diameter Water Main Replacement Program <br />As Water Resource Manager, Adelbert oversees the planning, design, and <br />delivery of over 60,000 linear feet of new water transmission mains, including <br />48,080 LF of 8-inch, 8,072 LF of 12-inch, and 4,282 LF of 16-inch lines, plus <br />associated Consumer Line Relocations. He directs the route feasibility <br />study, coordinates topographic and boundary surveys, manages Subsurface <br />Utility Engineering exploration and geotechnical investigations, and leads <br />preparation of phased design packages while supporting permitting, <br />procurement, and construction-phase engineering. <br />Location: Miami-Dade, FL. Dates: 2025-Ongoing. Contract No.: 23HBCE002/TA <br />No 001. Reference: Rudy Ibarra, PE, Rudy.Ibarra@miamidade.gov. <br />City of Riviera Beach, W 15th St from Ave R to Ave L <br />On this Design-Build project constructing a new raw water treatment plant <br />and expanding the existing raw water network, Adelbert leads review of the <br />transmission line design and coordinates comment resolution. The work <br />includes installation of new wells and raw water transmission lines connecting <br />to the treatment plant. <br />Location: Riviera Beach, FL. Dates: 11/2023-Ongoing. <br />Puerto Rico Aqueduct and Sewer Authority (PRASA), Improvement to <br />Sanitary Trunk Sewer Van Scoy <br />As Water Resource Design Manager, Adelbert oversees the design and <br />coordination of a 2.3 km sewer force main redirecting flows from the Toa Alta <br />Heights Pump Station away from the existing Van Scoy trunkline. He directs <br />all technical aspects of the alignment, including hydraulic evaluation, utility <br />conflict mitigation, and constructability planning for roughly 1 km of open- <br />trench installation and 1.3 km of Horizontal Directional Drilling to minimize <br />surface disruption and meet permitting and agency standards. <br />Location: Bayamon, Puerto Rico. Dates: 04/2024-Ongoing. Reference: Ramon Ortiz, 787.781.9050, Ramon.Ortiz- <br />22 Years of <br />Experience <br />Years with HBC <br />1 years <br />Education <br />B.S. in Civil Engineering, <br />Utah State University, <br />Logan, UT (2004) <br />A.S., A.P.E. Civil <br />Engineering, Snow College, <br />Ephraim, UT (2002) <br />Registration(s) <br />PE (FL) No. 103419; PE (UT, <br />AZ, CO, SC, HI) <br />Expertise <br />Water resources <br />engineering, wastewater <br />systems, stormwater <br />infrastructure, utility <br />design, hydraulic <br />modeling, master planning, <br />construction inspection, <br />site development