Laserfiche WebLink
HBC Engineering Company | 84 <br />Morgado@jacobs.com. <br />Puerto Rico Aqueduct and Sewer Authority (PRASA), PER for the Elimination of the Ciales, Morovis, and <br />Uniban Wastewater Treatment Plants <br />As Water Resource Design Manager, Adelbert directs the technical analysis for consolidating aging wastewater <br />treatment plants by redirecting flows to a new regional facility with expanded capacity and process upgrades. <br />He assesses existing infrastructure and hydraulic capacity, develops conceptual pump station layouts, manages <br />multidisciplinary coordination, and reviews system modeling to ensure regulatory compliance, long-term <br />serviceability, and cost-effective implementation. <br />Location: Rio Grande, Puerto Rico. Dates: Ongoing. Reference: Jose A. Rodriguez, PE, 787-641-6800, jarodriguez@ <br />csagroup.com. <br />* Tracy Aviary, Utility Rehabilitation and Master Plan <br />Adelbert led inspection of existing infrastructure to identify size, location, and condition; prepared the layout of <br />new water, sewer, and storm drain utilities in conjunction with the facilities master plan; and developed utility <br />models to size infrastructure. He prepared construction drawings and specifications and conducted construction <br />inspections, processing contractor payment requests, reviewing submittals, responding to RFIs, and issuing field <br />orders as needed through project completion. <br />Location: Salt Lake City, UT. Dates: 5/2009 - 9/2017. Reference: Matt Utley, (801) 597-6051. <br />* Riverside Lakes Dredging Project <br />Adelbert prepared construction documents for a dredging spoils lagoon, including a grading plan, volume <br />calculations, and a stormwater pollution prevention plan. <br />Location: Riverside, CA. <br />* Forza Commercial (private development), Woods Crossing Master Planned Commercial Development <br />Adelbert led inspection of existing infrastructure to identify size, location, and condition; directed the layout of <br />new utility infrastructure in conjunction with the facilities master plan; and developed utility models to size water, <br />sewer, and storm drain infrastructure. He prepared construction drawings, specifications, and individual site <br />plans, and conducted construction inspections, processing contractor payment requests, reviewing submittals, <br />responding to RFIs, and issuing field orders through project completion. <br />Location: Woods Cross, UT. Dates: 3/2014 - 11/2017. Reference: John Sawyer, (801) 879-2244, jsawyer@ <br />forzacommercial.com. <br />* Private development (Curtis Leavitt), Highland Master Planned Development <br />Adelbert directed preparation of a hillside development master plan for 805 housing units on 114 acres, including <br />master planning of the water, sewer, irrigation, and storm drain infrastructure. He prepared sizing reports for the <br />utility systems covering use demands, routing, and design criteria, and produced construction plans for bidding <br />and construction. <br />Location: Heber City, UT. Dates: 3/2016 - 3/2025. Reference: Curtis Leavitt, (385) 215-5838. <br />* Private development, Citifront Condominium, The Bridges at Citifront <br />Adelbert prepared the site plan package for the Citifront Condominium complex, including water, sewer, and storm <br />drain utility design, a grading plan, a drainage plan, and a drainage report. <br />Location: Tooele, UT. Dates: 4/2006 - 10/2006.* Prior to HBC <br />Adelbert Shaffer, PE