Laserfiche WebLink
HBC Engineering Company | 86 <br />As Project Engineer under senior engineering oversight, Joseph supported the design of a 2.3 km sewer force <br />main rerouting flows from the Toa Alta Heights Pump Station. He assisted in alignment development, performed <br />supporting hydraulic calculations, compiled data for utility conflict evaluations, supported preparation of design <br />documents for open-trench and Horizontal Directional Drilling segments, and assisted with permitting coordination. <br />Location: Puerto Rico. Dates: 04/2024-Ongoing. Reference: Ramon Ortiz, (787) 781-9050, Ramon.Ortiz-Morgado@ <br />jacobs.com. <br />City of West Palm Beach, Architectural and Engineering Services for Warren Hawkins Aquatic Center at <br />Gaines Park <br />As Water Resources Engineer, Joseph supports civil engineering improvements for the redevelopment of the <br />aquatic facility, including building and pool-area upgrades, a new zero-depth activity pool, a new lap pool, pool <br />equipment improvements, plumbing and utility modifications, and site-related code improvements. He supports <br />coordination of design documents for permitting, bidding, and construction-phase services. <br />Location: West Palm Beach, FL. Dates: 2025-Ongoing. Contract No.: 24-25-401 MK. <br />Palm Beach County, Boca Rio Rd from Palmetto Park Rd to Glades Rd Design-Build Project <br />On this Design-Build widening of Boca Rio Road, Joseph assisted in the intersection designs at Palmetto Park <br />Road, Boca Lago Road, Via Ancho Road, and Glades Road. The designs included proposed pedestrian detectors, <br />video loop systems, and replacement of span-wire poles with mast arms. <br />Location: Boca Raton, FL. Dates: 11/2023-Ongoing. Reference: Holly B. Knight, (561) 684-4150. <br />* Keller Group, The One at University City <br />As Project Engineer, Joseph performed daily progress reporting, coordinated material procurement for grout and <br />rebar, and coordinated with subcontractors for deliveries and installations, verifying that work matched design <br />specifications. He inspected each pile to confirm correct installation elevation and reported field issues to the <br />project manager, gaining construction inspection and field engineering experience. <br />Location: Sweetwater, FL. Dates: 5/2018-7/2018. Reference: Jose Delgado, (305) 989-1060. <br />* Keller Group, Ritz-Carlton Residences <br />As Project Engineer, Joseph supported test pile installations, monitoring the testing process to confirm each pile <br />met the minimum structural design specifications. He verified that each tension and compression test pile was <br />installed in the correct location and in accordance with design specifications. <br />Location: Sarasota, FL. Dates: 8/2018-8/2018. Reference: Jose Delgado, (305) 989-1060.* Prior to HBC <br />Joseph Maceo, EI