Laserfiche WebLink
HBC Engineering Company | 93 <br />Sonny Abia, PhD, PE <br />Structural Engineering | Utility Coordination & Permitting <br />Dr. Abia is a Florida Professional Civil Engineer with design and construction <br />experience across several specialties, including highway and roadway design <br />and construction, building and structures design, building inspections, <br />plans production, permitting, land development, project and consultant <br />management, contract administration, cost estimating, plans review, and <br />specifications. His project management experience includes bascule bridges <br />and public outreach, supported by training in public management, statistical <br />analysis, process design, quality control, and project scheduling, and by <br />coordination with federal, state, and local agencies. At HBC he leads utility <br />coordination and QA/QC on design and design-build projects, performing <br />detailed computation and specification reviews, resolving utility conflicts <br />with Utility/Agency Owners, conducting field reviews, assembling Final Utility <br />Certification packages, and performing structural inspections, structural <br />evaluations, and 40-year building recertifications for FDOT, Miami-Dade <br />County, and local agencies. <br />MDC-PROS, Multiple Parks 40-Year Building Recertification Inspection <br />Services Contract <br />Senior Civil/Structural Engineer and Project Manager responsible for 40-year <br />building recertification inspections for various MDC-PROS buildings. The <br />task work order contract includes signed and sealed electrical and structural <br />evaluation reports, recommendations for renovations or repairs, a structured <br />inspection approach, structural condition assessment, and long-term <br />maintenance strategies. <br />Location: Miami-Dade County, FL. Dates: 07/2024–Ongoing. Reference: Adria <br />Gonzalez-Leiva, PE, (305) 299-6928, adria.gonzalez-leiva@miamidade.gov. <br />City of Miami, Department of Fire-Rescue Station 5 <br />Structural Engineer and reviewer for preparation of design plans for the <br />structural beam modification required to accommodate fire truck clearance <br />at Fire-Rescue Station 5, located at 1200 NW 20th Street. The modification <br />required cutting the existing concrete beam and reinforcing it with steel <br />plates. Performed review of the structural analysis of the existing beams and <br />of the modified beam with the added steel plates supplementing the reduced <br />concrete section and remaining reinforcement. Plans were approved by the <br />City of Miami Building Department. <br />Location: Miami, Miami-Dade County, FL. Dates: 2020. <br />MDC-DTPW, NW 84th Avenue Widening and Reconstruction from NW <br />58th Street to NW 74th Street Design-Build <br />Utility Coordinator and QA/QC Reviewer for the widening and reconstruction <br />of NW 84th Avenue into an ultimate curved five-lane undivided urban roadway. <br />Project elements include added northbound and southbound through lanes, <br />a center two-way left-turn lane, harmonized driveways and intersecting side <br />38 Years <br />of Experience <br />Years with HBC <br />6 Years <br />Education <br />PhD in Civil Engineering, <br />University of Miami <br />(06/25/2010) <br />M.S. in Civil Engineering, <br />Florida International <br />University (08/13/1992) <br />B.S. in Civil Engineering, <br />Florida International <br />University (08/20/1990) <br />Registration(s) <br />PE (FL) No. 48190 <br />(07/15/1994) <br />Licenses & Certifications <br />TTC Advanced Certification <br />Certification General <br />Course in Construction, <br />City and Guilds of London <br />Institutes <br />Expertise <br />Utility coordination, <br />structural engineering, <br />QA/QC, roadway design, <br />permitting, inspections, <br />bridge design, drainage <br />systems, project <br />management, construction <br />oversight <br />* Prior to HBC