HBC Engineering Company | 94
<br />streets, sidewalks in both directions, a new closed drainage system interconnected with the existing system, a new
<br />stormwater management facility to compensate for additional impervious area, culvert extensions at NW 58th
<br />Street, a retaining wall for the culvert extension, replacement of two mast arms, signalized intersection upgrades,
<br />a landscape inventory and disposition plan, a new street lighting system, utility conflict avoidance, and removal
<br />and disposal of contaminated or solid waste material to a Class I landfill facility.
<br />Location: Doral, Miami-Dade County, FL. Dates: 2022–Ongoing. Cost: $1M. Reference: Alejandro Sauleda, (305) 375-
<br />4866, alejandro.sauleda@miamidade.gov.
<br />MDC-DTPW, NE 2nd Avenue Reconstruction from NE 20th Street to NE 36th Street Design-Build
<br />Chief Utility Coordinator and QA/QC Reviewer for the reconstruction of NE 2nd Avenue from NE 20th Street to
<br />NE 36th Street. Project includes roadway reconstruction, a new storm sewer system, sidewalks, curb and gutter,
<br />on-street parking, signing and pavement marking, signalization, decorative lighting, landscaping, and water main
<br />installation with all appurtenances, together with utility coordination and QA/QC reviews.
<br />Location: Miami-Dade County, FL. Dates: 2022–Ongoing. Reference: Alejandro Sauleda, (305) 375-4866, alejandro.
<br />sauleda@miamidade.gov.
<br />FDOT District 4, SR-817/University Drive Roadway Improvements from SW 24th Street/Nova Drive to EB SR-
<br />84
<br />Utility Coordinator and QA/QC Reviewer for roadway improvements along SR-817/University Drive from SW 24th
<br />Street/Nova Drive to eastbound SR-84. Project includes pavement widening for a proposed auxiliary lane from NW
<br />23rd Street to the westbound I-595 ramp; relocation of existing drainage structures, overhead signs, a mast arm,
<br />and utility poles; reconfiguration of the bus stop bay at the northeast corner of SW 24th Street/Nova Drive and
<br />University Drive; and reconfiguration of right-turn lanes for the Royal Grand Community, PNC Bank, and SW 24th
<br />Street/Nova Drive to improve traffic flow and safety.
<br />Location: Broward County, FL. Dates: 2022–Ongoing. Cost: $1.7M.
<br />FTE, Wrong-Way Vehicle Detection System Implementation Design-Build
<br />Utility Coordinator and QA/QC Reviewer for the design and implementation of 41 wrong-way vehicle detection
<br />systems covering 48 exit ramps along SR-821/HEFT, SR-91/Florida's Turnpike Mainline, and SR-869/Sawgrass
<br />Expressway. Project included signing and pavement marking and ITS signal detection systems along exit ramps to
<br />detect wrong-way vehicular traffic.
<br />Location: Miami-Dade, Broward, and Palm Beach Counties, FL. Dates: 2019. Reference: Jasmi Alemany, PE, (407)
<br />264-3068, jasmi.alemany@dot.state.fl.us.
<br />FDOT District 4, SR-7/US-441 Transit Corridor Improvements Task 2
<br />QA/QC Reviewer and Utility Coordinator for construction of a shared-use path along the North Fork New River
<br />connecting SR-7/US-441 to NW 31st Avenue, a shared-use path along SR-7/US-441 connecting Oakes Road to the
<br />New River Greenway with two pedestrian underpasses at the SR-7 northbound to I-595 on-ramp and the I-595
<br />westbound to SR-7 northbound off-ramp, and sidewalk construction on the east side of SR-7/US-441 from Orange
<br />Drive to Oakes Road. Work included plan reviews, drainage and signalization coordination, and utility alignment
<br />verification.
<br />Location: Broward County, FL. Dates: 2017–2023. FPID: 429576-3-52-01. Reference: Robert Lopes, PE, (954) 777-
<br />4425, robert.lopes@dot.state.fl.us.
<br />Sonny Abia, PhD, PE
|