My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Park 1 of Florida, LLC
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 15-03-01 Pier Park Lot Attendant
>
Responses
>
Park 1 of Florida, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2015 1:01:40 PM
Creation date
3/24/2015 3:14:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Pier Park Lot Attendant
Bid No. (xx-xx-xx)
15-03-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On -going Review and Additional Training <br />Performance reviews are given to all associates semi - annually or annually. <br />• Remedial training is provided as needed. <br />• A structured disciplinary process is used if necessary. <br />• Manager meetings occur weekly. <br />• Citywide meetings for associates are held quarterly for additional training, feedback, and <br />to discuss their suggestions and ideas. <br />• A structured associate suggestion program is utilized company -wide and rewards are <br />given for the best suggestions: management has committed to respond to all associates' <br />suggestions in five business days or less. <br />• Random drug testing is used company- wide based on a lottery system: associate specific <br />drug testing is used in the event of accidents or behavioral incidents. <br />• Polygraph Testing is used as an investigative tool for specific problems subject to Federal <br />laws governing their use. <br />18113 a-, e- Park One of Florida <br />Cim of Sturm- Ides Bench RFP AV 13 -03 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.