Laserfiche WebLink
We Have Relevant Experience and Technical Expertise <br />KISC has been and continues to be a leader in the industry for the construction of bridges of all <br />types and sizes. Our team brings a wealth of experience in elements such as bridge structures, working <br />over water, pedestrian use elements, drilled shafts, pouring the bridge deck and soil mixing. Our team has <br />completed several projects in the southeastern United States within the past eight years similar to the scope <br />of work planned for the North Bay Road Pedestrian Emergency Bridge. The following chart highlights these <br />relevant projects and their similarities. <br />Projects within the last 8 years <br />Bear Cut and West Bridges Emergency <br />. <br />♦ <br />. <br />Rehabilitation and Water Main Replacement <br />Port Everglades <br />5th Street Bascule Bridge Replacement <br />12th Avenue Bascule Bridge <br />63rd Street Bascule Rehabilitation <br />CON RAC <br />SR 464 Railroad Grade Separation <br />1 -95 Pedestrian Bridge <br />Biloxi Bay Bridge <br />MKiewit <br />Construction of the North Bay Road Pedestrian Emergency Bridge I No. 14 -09 -01 <br />