My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kiewit Infrastructure South Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-09-01 Construction of the N. Bay Road Pedestrian Emergency Bridge
>
Responses
>
Kiewit Infrastructure South Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 10:54:55 AM
Creation date
4/21/2015 10:50:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction of the N. Bay Road Pedestrian Emergency Bridge
Bid No. (xx-xx-xx)
14-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This core team will not only successfully complete your project on time, with ZERO accidents and to the <br />highest quality standards, they will also ensure that your needs and those of key project stakeholders, local <br />residents, and the travelling public are addressed. Detailed project experiences of these individuals that have <br />made a commitment and are dedicated to making this project a success are outlined on the following pages. <br />Key Staff and the Responsibility for the Coordination of the Work <br />While the following positions have been identified as "key," there are many support positions and activities <br />that we are uniquely capable of filling and performing. Our specific experience with roadway and structures <br />projects allows us to draw upon our many organizational talents and knowledge to review and provide <br />analysis with value engineering ideas, as well as provide unique solutions to any challenging situation. The <br />team members chosen as key personnel for this project were selected with those qualities in mind, and for <br />their knowledge and experience in addressing and managing many of the challenges that are anticipated <br />on this project. Following are highlights of our key personnel and their unique roles during this project. <br />pK5Kiewit <br />Construction of the North Bay Road Pedestrian Emergency Bridge I No. 14 -09 -01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.