My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kiewit Infrastructure South Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-09-01 Construction of the N. Bay Road Pedestrian Emergency Bridge
>
Responses
>
Kiewit Infrastructure South Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 10:54:55 AM
Creation date
4/21/2015 10:50:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction of the N. Bay Road Pedestrian Emergency Bridge
Bid No. (xx-xx-xx)
14-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 <br />5' x 4' Exfiltration Trench <br />356 <br />LF <br />qO " <br />NI ZVO <br />72 <br />Core Existing Manhole (18" RCP) <br />1 <br />EA <br />voo <br />Z, 000 — <br />73 <br />SUBTOTAL DRAINAGE <br />LG. 2D <br />74 <br />BRIDGE <br />South Bridge Approach (Sta 20 +54.14- <br />21 +29.73) - (inclusive of all excavation, soil <br />remediation, compaction, testing, <br />1 <br />LS <br />230006 <br />$ o�e7a <br />hauling /disposal of unsuitable material, <br />MSE walls purchase and installation, <br />75 Iconcrete <br />work and asphalt) <br />North Bridge Approach -(STA 24 +54.15- <br />26 +29.96) (inclusive of all excavation, soil <br />remediation, compaction, testing, <br />1 <br />LS <br />165q,000— <br />t (,59. ou o <br />hauling /disposal of unsuitable material, <br />MSE walls purchase and installation, <br />76 <br />concrete work and asphalt) <br />FDOT Bridge Approach to Approach (Sta <br />77 <br />21 +29.73 -24 +54.15) <br />Labor and Material to F &I all electrical <br />1 <br />LS <br />_ <br />f / 3$ oa o <br />78 <br />components per plans <br />i <br />79 <br />F &I Type B Fencing FDOT Index 802 <br />105 <br />LF <br />F &I Decorative Vertical Fence to Match <br />Existing w/ Double Traffic Gate and Single <br />300 <br />LF <br />y <br />+P <br />80 <br />Ped Gate <br />81 <br />SUBTOTAL BRIDGE <br />x $,2Z <br />TOTAL BASE BID (ITEMS 1 THROUGH 81) <br />$ Gr'f 9 5.40 <br />All unit rates are inclusive of all material, labor, equipment, excavation, handling, rehandling, temporary storage <br />of material, installation, backfill, testing, compaction, hauling /disposal of any unsuitable material and <br />restoration of any affected areas. <br />(T) Grand total must equal amount shown on line "TOTAL LUMP SUM BID PRICE WITH SCHEDULE OF <br />VALUES OF:" on Bid Form for Section 1. <br />We have included herewith, the required security Bid Bond, as required by the Instruction to Bidders. <br />All applicable federal state and local taxes and permit fees are included in the Bid Price. <br />Permit fees shall be in accordance with the Owner's rate schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.