My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kiewit Infrastructure South Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-09-01 Construction of the N. Bay Road Pedestrian Emergency Bridge
>
Responses
>
Kiewit Infrastructure South Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 10:54:55 AM
Creation date
4/21/2015 10:50:38 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction of the N. Bay Road Pedestrian Emergency Bridge
Bid No. (xx-xx-xx)
14-09-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIIS - PROJECT EVALUATION Wednesday, January 07, 2015 - 3:03:12 PM Page I of 2 <br />MIAMI- MIAMI-DADE COUNTY, FLORIDA <br />I I -EE Capita[ Improvements Information System <br />Public Works and Waste Management <br />Consultant Evaluation <br />Evaluation Type: Standard Evaluation <br />Contract: 20120152 Work Order No: NIA <br />Contract Design -Build Services for Rehabilitation of Bridges No. 874549 (West Bridge) and 874544 (Bear Cut Bridge) on <br />Name: the Rickenbacker Causeway <br />Award Contact: Luis E. Baldo <br />Amount: v�3Q,578,017.21 <br />(305) 375 -2111 <br />Contract DESIGN BUILD <br />Type: <br />Contractor/ KIEWIT INFRASTRUCTURE SOUTH CO FEIN: 470530367 <br />Consultant: <br />Evaluator ID: baldo Date: 1/712015 Period: Project conclusion or closeout <br />Ratinct <br />NIA <br />Griteria <br />Schedule - Quality of schedule & adherence to schedule <br />resulting in timeliness and minimizing delay to the -owner and <br />community. <br />Cost effectiveness & efficiency - Budget compllance & value of <br />work. <br />Vision - Design - Concepts or adherence to criteria. <br />LsCuIppliers. operation - Teamwork & rela #ionship with owner, subs a <br />nation - Ability to organize, schedule and complete <br />tasks <br />tasks in adherence to the schedule. <br />6- <br />d <br />Accuracy & Technical Skills - Cost estimating, scheduling, <br />shop and other drawings, plans, manuals, project <br />documentation and conflict resolution. <br />lCompleteness - Compliance with contract documents, permits, <br />Codes &standards. <br />$- <br />if <br />Responsiveness - Timely, clear & concise responses to owner <br />comments and correspondence. <br />Commitment - intangibles & contribution to project success. <br />Personnel - Quality and dedication of project staff. <br />Management - Leadership ability. <br />12- <br />[:k::]t____ <br />= <br />== <br />Quality - Work performed correctly the first time. <br />Overall Performance Average: 3 .88 <br />Documentation that supports this evaluation and Contractor'slConsultant's comments can be obtained by <br />contacting: <br />Luis E. Baldo at Plrone# (305) 282 -0281 <br />Evaluation Reviewed by: Supervisor M Division Chief ❑ Assistant Director ❑ Director ❑ <br />The method of delivery of this evaluation to contractor /consultant: Certified Mail ❑ EMail ❑ Fax M <br />Hand ❑ <br />(Unresponsive Performance by contractor /consultant requires 2 delivery methods, one MUST be Certified Mail.) <br />littp:// intralciis /frinContractorEvalttation. asp ?Se1CICCNO= 2891 &Se1Mode= Print &Se10EI... 1/7/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.