Laserfiche WebLink
Construction Engineering Consultants, Corp. Page 2 <br /> <br /> Design and Construction for widening of vehicular tunnel under Runway 12/30 in MIA. <br /> Fabrication and erection of precast sound barrier panels on elevated <br /> Metrorail Guideway. <br /> Railroad Bridges over Pompano and C-13 Canals in Broward County <br /> VECP redesign and construction of sound barrier on I-195, Dade County <br /> <br />Nov/96-Present President and Principal Engineer for Construction Engineering Consultants, Corp. <br /> Constructability/Scheduling/Claims/Cost consultant contract with FDOT District Six <br />Construction since 1998 District Project Manager, Mikhail Dubrovsky, P.E. (305) 499-2354 <br /> Constructability/Scheduling/Claims/Cost consultant contract with FDOT District Four <br />Construction since 2001 District Project Manager, Jeanette Harris, P.E. (954) 777-4184 <br /> Constructability/Scheduling/Claims/Cost consultant contract with Tampa-Hillsborough X-way <br />Authority since 2000 Project Manager, Ben Muns, P.E. (813) 272-5987 <br /> Constructability/Scheduling/Claims/Cost consultant contract with Dade Transportation <br />Consultants (MDX) Project Manager, Tom Muzicka, P.E. (305)514-3410 <br /> Contractor Specialty Engineering and Design <br /> Cofferdam design for Boynton Beach Blvd Bascule <br /> Design of tension pile and seal dewatering scheme at MIA Tunnel for OFL <br /> Fuel dock replacement, FPL’s Turkey Point Plant <br /> Shoring design SW Florida Regional Airport upper drive for PCL <br /> Design of 300’ x 900’ cofferdam for Downtown Dadeland Project <br /> Design of temporary supports for two integral diaphragm bridges – (MDX) SR 836 at H.E.F.T. <br /> Design of temporary critical walls for Turnpike over Atlantic Blvd. – Condotte America <br /> Design of temporary supports for excavations and cap forms for SR-874 Kendall Drive – <br />Condotte America (MDX) <br /> Design of temporary supports for excavation – Metrorail Orange Line <br /> <br />Several constructability review and scheduling projects completed during this period include: <br /> Sunny Isles Blvd Bascule Rehabilitation <br /> I-95 ITS Interim Operations Center <br /> NE 79th Street Bascule Rehabilitation <br /> I-95 Widening and Pavement Repairs <br /> Biscayne Blvd/NE 203 Street Interchange <br /> NW 79th Ave over the Miami Canal <br /> I-95/Okeechobee Rd. Interchange in Palm Beach <br /> Okeechobee Road Depressed Roadway & Improvements <br /> Collins Avenue Reconstruction <br /> SW 2nd Avenue Bascule Bridge <br /> Royal Park Bascule Bridge Replacement <br /> I-95 Sound Walls, Miami-Dade County <br /> Turnpike Thomas B. Manual Deck Replacement <br /> Turnpike Mainline, Griffin to Sunrise <br /> Turnpike Mainline, Sunrise to Atlantic <br /> NW 12th Avenue Bascule Bridge <br /> NW 5th Avenue Bascule Bridge <br /> Port of Miami Tunnel <br /> SR 826/836 Interchange <br /> Seven Mile Bridge Repairs <br /> I-95 Managed Lanes through SR 112 Interchange <br /> I-595 Corridor Improvements <br /> SR 826 / SR 836 Interchange <br /> Brickell Avenue (US-1) Drainage Improvements