My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ebsary Foundation Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 14-09-01 Construction of the N. Bay Road Pedestrian Emergency Bridge
>
Responses
>
Ebsary Foundation Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2015 10:17:15 AM
Creation date
4/21/2015 10:59:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Construction of the N. Bay Road Pedestrian Emergency Bridge
Bid No. (xx-xx-xx)
14-09-01
Project Type (Bid, RFP, RFQ)
RFP
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Incorporated 1930 <br /> <br />SCHEDULE / METHODOLOGY <br /> <br /> SUITABILITY: <br /> <br />SEE THE FOLLOWING ATTACHMENT <br /> <br /> PROJECT ORGANIZATION: <br /> <br />1. Preconstruction <br />1.1. Contract Execution, Pick up permits, preconstruction meeting with owner. <br />1.2. Perform all preconstruction utility locates, permit notifications and jobsite posting. <br />1.3. Perform necessary exploratory test pitting for conflicting utilities and drainable. <br />1.4. Project Submittals, to include, installation methodology and procedures, concrete mix <br />designs, curing procedure, MOT Plan, Environmental and Safety Plans, rebar shop <br />drawings, precast shop drawings, Storm Water Prevention Plan, Baseline construction <br />schedule, material submittals, turbidity control plan, design submittal for crane trestle, <br />MSE Wall facing and design, etc. <br />1.5. Preconstruction survey of existing structures and buildings. <br />1.6. Install vibration monitoring stations adjacent to existing structures. <br />1.7. Construction Fencing, Signs and Jobsite Trailers <br />1.8. Preconstruction Survey and Stakeout. <br />1.9. Install all temporary fencing adjacent to the temporary construction easement and silt <br />fencing. <br />1.10. Pre ground improvement soil analysis and proposed final ground improvement technique <br />and scope. <br /> <br />2. Mobilization & Site Work <br />2.1. Implement Storm Water Pollution Plan <br />2.2. Implement Environmental Safety Plan <br />2.3. Implement Marine and Roadway MOT plan <br />2.4. Notify Boaters of the beginning of construction; which will partially block the canal. <br />2.5. Deliver equipment and stage materials to south end bent Crane and drilled shaft <br />equipment is first. <br />2.6. Install all required turbidity curtain. <br />2.7. Demo and remove all conflicting abandoned pipes and utilities. Included is the removal of <br />the 14” HDPE and Yard Drain
The URL can be used to link to this page
Your browser does not support the video tag.