Laserfiche WebLink
<br /> <br />Page 7 <br /> <br />7.14. Install collapsible bollards <br />7.15. Perform asphalt repairs over top of new drainage. <br />7.16. Install all necessary signage in accordance with the pavement marking and signing plan <br />7.17. Install FDOT index 802 fencing around end bent to close off area under bridge <br />7.18. Provide all necessary as-built drawings <br />7.19. Punch List <br />7.20. Site Restoration, removal of temporary fencing, silt fence, turbidity barrier, inlet <br />protection, etc. <br />7.21. Closeout <br /> <br /> TIMELINE: <br /> <br />SEE THE ATTACHED PRELIMINARY CPM SCHEDULE <br /> <br />