Laserfiche WebLink
<br /> <br />Page 5 <br /> <br />30. Furnish, Install and backfill S-201 24” Yard Drain Pipe with approximately 61 LF of 18” PVC <br />pipe and one gutter inlet <br />31. Furnish, Install and backfill S-202 24” Yard Drain <br />32. Furnish and install 6 ea. Collapsible bollards <br />33. Saw cut, mill and removed existing asphalt paving for drainage installation. <br />34. Remove and sotock pile existin gbridck pavers. <br />35. Install Type “F” concrete curbing, type “E” drop curb, in accordance with roadway plan <br />36. Installation of Asphalt repair, match existing <br />37. Furnish the concrete barrier wall at the end of the MSE wall at each end of the bridge with <br />associated crash cushions. <br />38. Furnish and install brick paver walkway with concrete curb, to match existing <br />39. ADA access ramps <br />40. Cast in Place concrete sidewalk to match the existing with appropriate sidewalk ramps <br />41. Replace herringbone brick paver crosswalk at N.E. 174th Street <br />42. Remove existing parking meters <br />43. Furnish and install replacement traffic signage in accordance with roadway plans. <br />44. Furnish and install 9 ea. single arm light poles with all associated conduit, pull boxes, and <br />incidental electric. Three (3) each Light Pole Pilasters on the bridge structure and six (6) precast <br />light bole bases. <br />45. All additional incidental and temporary work in order to complete the scope of work as shown in <br />the Calvin, Giordano & Associates Inc. North Bay Road drawings dated 12/10/2013 and the <br />BHA, Inc. North Bay Road Bridge Drawings dated 7-09. <br /> <br /> COMPREHENSIVE PROJECT LIST: <br /> <br />1. ONGOING MAJOR PROJECTS LIST <br /> <br />1.1. Island Gardens Megayacht Marina (Dredging & Turbidity Management) – Furnish time <br />and material support for installation, maintenance, and removal of all necessary turbidity <br />management devices. Contract Value $ 1,670,000. Bruce Wood., Jay Cashman, Inc., <br />(617) 890-0600, bwood@jaycashman.com <br />1.2. Master Pump Station No. 3 Cofferdam – Miami Dade Water and Sewer Department – <br />Design, Install, and Remove Temporary Cofferdam for Pump Station Construction. <br />Installation of 12 ea. 24”x75ft Augercast Foundation Piling. Contract Value $ 2,789,000. <br />Patrick Carr, Poole & Kent Company of South Florida; (305) 325-1930, <br />patc@pkflorida.com <br />1.3. Herbert Hoover Dike Rehabilitation Project, Culverts 1 & 1A Replacement – US Army <br />Corps of Engineers – Temporary Combi-Wall Sheet Pile Cofferdams, Permanent steel <br />Sheet Piling, 24” Augercast Piling. Contract Value: $ 15,672,012.00. Mauricio <br />Gonzalez, Odebrecht Construction Company, (305) 341-8800, <br />mjgonzalez@odebrecht.com.