Laserfiche WebLink
Task 6: Final Report <br /> The final report will be a combination and summation of all tasks. A final report and highly graphic <br /> executive summary will be produced as well as PowerPoint presentation of that report. Drafts will <br /> be delivered to the City for review. After the final presentation, bound and electronic copies will <br /> be made available. <br /> This project can be completed within six months from the notice to proceed for a cost of$75,000. <br /> 2. OBJECTIVE —Collins Avenue Corridor Traffic Analysis Study Methodology <br /> BDPG in association with The Corradino Group will prepare a Corridor Traffic Analysis Study for <br /> Collins Avenue within the municipal boundaries of the City of Sunny Isles Beach. The scope of the <br /> project is to analyze current and future level of service on various intersections along the Collins <br /> Avenue corridor within the City limits. <br /> Project Description <br /> • Various intersections on Collins Avenue from Bayview Drive to 193rd Street are to be <br /> analyzed <br /> The following methodology is proposed for conducting the traffic study: <br /> • The traffic study will evaluate intersections along Collins Avenue throughout the City.Traffic <br /> counts will be collected for the twenty nine (29) intersections listed at the end during the <br /> peak day/AM & PM peak periods. These intersections were selected after discussing with <br /> the City's staff. Any additional data collection will be billed separately. <br /> • Committed Development/ Background Growth <br /> o All committed developments (approximately 20) within the study area shall be <br /> quantified as provided by the City of Sunny Isles Beach. Existing traffic will be <br /> adjusted with an annual growth factor for the future condition. The growth factor will <br /> be determined following the FDOT historical count's regression analysis. <br /> • A description of the type of land use, category, trip rates, and other pertinent data indicated <br /> in the ITE Trip Generation Tables will be included for the committed development land <br /> uses.All future trip generation traffic volumes will be based on ITE Trip Generation Manual <br /> (9thEdition). <br /> • Intersection capacity/LOS analysis will be performed following the HCM 2010 methodology <br /> and using the latest version of Synchro / SimTraffic or HCS software. Such analysis will <br /> provide the results for the Level of Service (LOS), volume to capacity ratio (V/C) and other <br /> outputs such as Queue Lengths and Vehicular Delay for the following conditions: <br /> o Existing Condition Base Year(2015) <br /> o Proposed Future Condition with Committed Projects (2019) <br /> • Intersections that show deficient capacity will be highlighted and recommendations will be <br /> 6 <br /> Bell David Planning Group <br /> 1019 NE 104th Street Miami Shores, FL 33138 <br /> SIB TMP and CTA 032515 <br />