Laserfiche WebLink
• <br /> Sample Project Description Table <br /> CURRENT CONOTIONS <br /> I I i ......_�... ♦OOITROtiANOARO N"ra"TMO <br /> Y RO.IR IRO" " NUOI "®,AtlmR IOAO mf Nwaf LENGTH SIGNAL SPUD SLUT C,�� 0 O R GROWTH�T VOyd LNYW <br /> 1Attv IIONW JIUR) saint OUR) VOWS¢VOWHL VOWIIZ NTR GpaO <br /> rarzsrum!7..mommemi Nr7r ____ : ____ <br /> 1 Sr 04 IT Im.ITEF3717,11111'RK'a2NORN1 )A AG � �W'. M!111111r�tQCI®L•. <br /> =mama 11111W11111111111111111•111111M-MIIMIIIRMIIIIKIIMIIIE <br /> �7l•N •-01111111E1111111111M=1 fl =rim f p-..' slum=am 0 H• <br /> Task 3: Needs Assessment <br /> The analyses provided above will point to various levels of need, for various modes. From this <br /> assessment a list of potential projects will be developed. Roadways that meet or exceed the <br /> existing level of service standard will need improvements to assure that they meet the City's <br /> adopted level of service standards. The roadway level of service is not the only consideration of <br /> need. The transit network will be examined to determine the adequacy of the system, as well as <br /> other modes. Public perception of need will be considered. The four project categories will be <br /> developed including: <br /> • Capacity <br /> Projects will be developed to address streets that have roadway capacity issues. These projects <br /> generally will focus on improving intersections and links that are at LOS D or worse, in the existing <br /> or future year. These will be mapped along with current roadway projects. <br /> • Alternative Mode <br /> This will focus on areas of transit, pedestrian, and bicycle and their proposed levels of service, <br /> particularly as they interface with major intersections, trip generators and transit stations. <br /> • Corridor Enhancement <br /> This work will take into consideration arterial roads that function as major conduits of traffic <br /> through the City. <br /> • Policy <br /> This will focus on policy initiatives which may help mitigate lack of mobility. These may include <br /> concurrency, Transportation Demand Management, and Transportation System Management <br /> measures. <br /> Task 4: Development of Potential Projects <br /> Potential projects that arise from the needs assessment resulting from the analysis will be placed <br /> in a "Project Bank", which will essentially be the City's Transportation Master Plan Capital <br /> Improvements schedule. Projects suggested in previous plans will be incorporated into the master <br /> plan. <br /> Each project will be conceptually developed. This will entail the development of a project sheet <br /> that provides: <br /> Description of the project <br /> • Location <br /> • Cost <br /> -Planning <br /> -Design <br /> -Construction <br /> 4 <br /> Bell David Planning Group <br /> 1019 NE 104th Street Miami Shores, FL 33138 <br /> SIB TM') and CTA 032515 <br />