My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2394
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2015 3:27:29 PM
Creation date
4/27/2015 3:27:25 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2394
Date (mm/dd/yyyy)
04/16/2015
Description
2nd Amd to Agmt w/Bell David to Provide Additional Planning and Zoning Srvs
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> This project can be completed within six months from the notice to proceed for a cost of$75,000. <br /> 2. OBJECTIVE— Collins Avenue Corridor Traffic Analysis Study Methodology <br /> BDPG in association with The Corradino Group will prepare a Corridor Traffic Analysis Study for <br /> Collins Avenue within the municipal boundaries of the City of Sunny Isles Beach. The scope of the <br /> project is to analyze current and future level of service on various intersections along the Collins <br /> Avenue corridor within the City limits. <br /> Project Description <br /> • Various intersections on Collins Avenue from Bayview Drive to 193rd Street are to be <br /> analyzed <br /> The following methodology is proposed for conducting the traffic study: <br /> • The traffic study will evaluate intersections along Collins Avenue throughout the City.Traffic <br /> counts will be collected for the twenty nine(29) intersections listed at the end during the <br /> peak day/AM & PM peak periods. These intersections were selected after discussing with <br /> the City's staff. Any additional data collection will be billed separately. <br /> • Committed Development/Background Growth <br /> o All committed developments (approximately 20) within the study area shall be <br /> quantified as provided by the City of Sunny Isles Beach. Existing traffic will be <br /> adjusted with an annual growth factor for the future condition. The growth factor will <br /> be determined following the FDOT historical count's regression analysis. <br /> • A description of the type of land use, category, trip rates, and other pertinent data indicated <br /> in the ITE Trip Generation Tables will be included for the committed development land <br /> uses.All future trip generation traffic volumes will be based on ITE Trip Generation Manual <br /> (9th Edition). <br /> • Intersection capacity/LOS analysis will be performed following the HCM 2010 methodology <br /> and using the latest version of Synchro / SimTraffic or HCS software. Such analysis will <br /> provide the results for the Level of Service (LOS), volume to capacity ratio (V/C)and other <br /> outputs such as Queue Lengths and Vehicular Delay for the following conditions: <br /> o Existing Condition Base Year(2015) <br /> o Proposed Future Condition with Committed Projects (2019) <br /> • Intersections that show deficient capacity will be highlighted and recommendations will be <br /> made to provide mitigation in the form of signal timing modifications, lane additions or any <br /> other. <br /> • Corradino will meet with the City for up to two meetings, if needed.Additional meetings will <br /> be charged on an hourly basis. <br /> 6 <br /> Bell David Planning Group <br /> 1019 NE 104th Street Miami Shores, FL 33138 <br /> SIB TMP and CTA 031815 <br />
The URL can be used to link to this page
Your browser does not support the video tag.