My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2401
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2015 10:06:03 AM
Creation date
5/21/2015 10:05:39 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2401
Date (mm/dd/yyyy)
04/16/2015
Description
Award Bid 14-11-01 & Agmt w/Florida Engineering & Development for 174th St Roadway Improve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: City of Sunny Isles Beach <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, Florida 33160 <br /> Schedule and Methodology: <br /> Project is schedule to proceed in the following sequence: <br /> Phase 1 Start at the North side of NE 174th Street from Station 36+50 to Station 27+50. Activities <br /> involved in this phase of construction are <br /> MOT <br /> Demolition <br /> Drainage <br /> Prepare Sub base <br /> Concrete Curb and Gutter and Sidewalks <br /> Irrigation and Landscaping <br /> Lime rock Base <br /> Asphalt 1st Lift <br /> Phase 2 Start at North Side of Station 27+50 to Station 19+80 at the intersection of NE 174th street and <br /> North Bay road 1/2 lot of D,C and R. Activities involved in this phase of construction are: <br /> MOT <br /> Demolition <br /> Drainage <br /> Prepare Sub base <br /> Concrete Curb and Gutter and Sidewalks <br /> Irrigation and Landscaping <br /> Lime rock Base <br /> Asphalt 1st Lift <br /> Phase 3 Start at Station 19+80(South side of NE 174th Street ) to Station 27+50. Activities involved in <br /> this phase of construction are <br /> MOT <br /> Demolition <br /> Drainage <br /> Prepare Sub base <br /> Concrete Curb and Gutter and Sidewalks <br /> Irrigation and Landscaping <br /> Lime rock Base <br /> Asphalt 1st Lift <br /> Phase 4 Start at South Side of Station 27+50 to Station 19+80 at the intersection of NE 174th street and <br /> North Bay road 1/2 lot of D,C and R. Activities involved in this phase of construction are: <br /> MOT <br /> Demolition <br /> Drainage <br /> Prepare Sub base <br /> Concrete Curb and Gutter and Sidewalks <br /> Irrigation and Landscaping <br /> Lime rock Base <br /> Asphalt 1st Lift <br />
The URL can be used to link to this page
Your browser does not support the video tag.