Phase 5. Throughout the project in a continuos operation the following operations will be performed: <br /> MOT <br /> 2nd lift Asphalt on Phases 1, 2, 3 and 4 <br /> Milling and Resurfacing West side of the project <br /> Landscaping complete <br /> Stripping and signage <br /> Close Out <br />