Laserfiche WebLink
<br />City of Sunny Isles Beach | Invitation to Bid No. 15-05-01 13 <br /> <br />design, testing and equipment shall be subject to the inspection and approval of the City Manager <br />or his designated representative for this project. <br />2.13 CLEAN-UP <br />All unusable materials and debris shall be removed from the premises at the end of each workday, <br />and disposed of in an appropriate manner. No equipment, material, debris, trailers or other items <br />may be stored in any location outside of the provided constr uction easements without written <br />approval from the City and the property owner. Upon final completion, the Bidder shall thoroughly <br />clean up all areas where work has been involved as mutually agreed with the associated user <br />department’s project manager. <br /> <br />2.14 FEDERAL, STATE AND LOCAL REGULATIONS <br />The successful Bidder shall comply with all federal, state and local ordinances, regulations, rules <br />and permits as well as any other laws that would apply to the services being provided. The Bidder’s <br />costs associated with regulatory requirements shall be included in the project cost whether depicted <br />specifically or not within the body of the proposal. <br /> <br />2.15 MATERIALS SHALL BE NEW AND WARRANTED AGAINST DEFECTS <br />The Bidder hereby acknowledges and agrees that all materials, except where recycled content is <br />specifically requested, supplied by the Bidder in conjunction with this solicitation and resultant <br />contract shall be new, warranted for their merchantability, and fit for a particular purpose. In the <br />event any of the materials supplied to the City by the Bidder are found to be defective or do not <br />conform to specifications: (1) the materials may be returned to the Bidder at the Bidder’s expense <br />and the contract cancelled or (2) the City may require the Bidder to replace the materials at the <br />Bidder’s expense. No provisions or allotments for delays or time extensions to the schedule as a <br />result of “defective”, unacceptable material, or reused material found shall be granted. <br /> <br />In the event that material is suspected by the City Representative of being reused or not new in <br />original packaging, the material may be rejected. The Bidder shall remove such material and <br />replace it at his/her cost and within the original schedule. No provisions or allotments for delays <br />or time extensions to the schedule as a result of “defective”, unacceptable material, or reused <br />material found shall be gra nted. <br /> <br />2.16 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A <br />NOTICE TO PROCEED: <br />The Bidder shall neither commence any work, nor enter a City work premise, until a written Notice <br />to Proceed (NTP) directing the Bidder to proceed with the work has been received by the Bidder <br />from any authorized City manager or his designee representative; provided however, that such <br />notification shall be superseded by any emergency work that may be required in accordance with <br />provisions included elsewhere in this solicitation and resultant contract. In addition to the written <br />NTP, the Contractor must supply the City with the required insurance and bond documents. <br /> <br />2.17 ACCIDENT PREVENTION AND BARRICADES <br />Barricades, cones, construction fencing, temporary construction fencing and off duty police officers, <br />per City regulations and other relevant requirements, shall be provided by the Bidder when work