My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Samson Oceanfront Park - Final
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(15-05-01) Samson Oceanfront Park Improvements
>
Samson Oceanfront Park - Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2015 2:13:06 PM
Creation date
5/27/2015 2:11:15 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson Oceanfront Park Improvements
Bid No. (xx-xx-xx)
15-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. 15-05-01 16 <br /> <br />Section 3 <br />Scope of Services / Technical Specifications <br /> <br />3.1 SCOPE OF SERVICES <br /> <br />Proposed are improvements to the Samson Oceanfront Park include all labor and material to <br />perform sanitary sewer piping within private and public right-of-way, pump station installation, <br />interior building demolition, building construction, playground installation, decorative concrete and <br />paver sidewalks, ADA ramps, detectable warning surfaces, curb, lighting, signage and striping with <br />all other associated work according to the attachments. Proposed improvements also include full <br />landscape and irrigation enhancements within the Park. Final completion deadline for Bidder to <br />finish all Work is for two-hundred and ten (210) days from issuance of notice to proceed from the <br />City Manager or his designee. Substantial completion shall be thirty (30) days prior to the final <br />completion deadline. Construction stakeout and as-built/record drawings will be provided by the <br />successful Bidder, as will all other surveying services required for project completion and close out. <br /> <br />If any portion of the contract documents or plans is not clear or contradictive, the Bidder is to <br />submit a question/clarification in writing prior to submitting a bid proposal. In any instance where <br />the attached scope of work is in conflict with FDOT or Miami-Dade County specifications the more <br />stringent specification will prevail. <br /> <br /> <br />END OF SECTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.