Laserfiche WebLink
perkinswill.com 103 <br />ESI SIMILAR WORK EXPERIENCE <br />ESI RELAVANT WORK EXPERIENCE <br /> <br /> 255 Alhambra Circle Corporate Office Building – Coral Gables, Florida <br />•HVAC Upgrade of the 600-Tons Chiller Plant, including the replacement of (2) Cooling Towers, (2) Chillers, and <br />related Condenser Water & Chilled Water Pumps, as well as Retrofit for ASHRAE 15 compliance, and a complete <br />upgrade of the Building Management System with optimization control to maximize Plant efficiency. <br />•MEP/FP Design for renovations of several offices suites throughout the Facility <br />•Engineering Evaluation of the HVAC System of the entire Facility <br />Assurant Solutions Facility – Miami, Florida <br />•HVAC Design Retrofit and Emergency Power Systems <br />•MEP/FP Programming and Design Development for a new 29,000 SF Multi-Purpose Training Facility <br />•Data Room Engineering Evaluation <br />•Redundant Chilled Water Evaluation for Building C <br />Brighton Administration Building – Brighton, FL <br />•MEP/FP Design of a 70,000 SF 4-story office building for the Seminole Tribe of Florida. <br />Brighton Educational Center – Brighton, FL <br />•MEP Design for a new 45,000 SF facility educational center for the Seminole Tribe of Florida. <br />Broward Health Medical Center – Fort Lauderdale, Florida <br />•Pediatric Pharmacy Renovation <br />•Outpatient CT Scan #3 Replacement <br />•Radiation Oncology CT Simulator Replacement & Upgrade <br />•Retail Pharmacy Renovation <br />•Main Pharmacy Bulk Storage <br />•Gift Shop Renovation <br />Broward Health Imperial Point – Fort Lauderdale, Florida <br />•Ambulatory Surgical Center: MEP/FP Design for a new ±12,000 SF Ambulatory Surgical Center (ASC) located on <br />the ground floor of the 4-story Medical Arts Pavilion, and consisting of four (4) Class C Operating Rooms, an 18- <br />bed Phase 1 & Phase 2 PACU Recovery area, auxiliary areas such as Decontamination & Sterile rooms, Sub-Sterile, <br />Anesthesia Workroom, Soiled Work Room & Clean Rooms, etc…, as well as an Administration area. The MEP <br />design included the addition of (2) dedicated Air Cooled Chillers, (2) Air Handling Units, and a 400kW Diesel <br />Generator to serve the ASC independently of the rest of the Building, as well as the distribution of lighting, <br />power, airflow, plumbing, medical gases, and fire protection for the entire space. <br />•Outpatient X-Ray Renovation & Equipment Replacement <br />•Medical Records Suite Renovation <br />•Human Resources Suite Renovation <br />•Medical Arts Building 4th Floor Cardiology Suite Fitout <br />Camana Bay – Grand Cayman, Cayman Islands <br />•MEP Design for the ±20,000 SF phased expansion of the Cayman International School. <br />•MEP/FP Design of Tenant Improvement spaces, including Offices, Retail, & Restaurants in Several Areas of the <br />Facility <br />•Several Engineering Evaluations, including of the Chiller Plant serving the entire 500-acre Town <br />City of Miami Beach – Miami Beach, Florida <br />•Miami Beach Police Department  New Geothermal Condenser Water distribution design <br />•Miami Beach Convention Center  New Geothermal Condenser Water distribution and Chilled Water piping <br />distribution design <br />1315 NW 98th Court, Unit 15 • Doral, Florida 33172 • Tel: (305) 418-9177, Fax: (305) 418-9178