|
104 City of Sunny Isles Beach New Facility Qualifications for Architectural Design Services
<br />•North Shore Youth Center HVAC Retrofit
<br />City of Pompano Beach Public Safety Building – Pompano Beach, FL
<br />•MEP/FP Design Retrofit of HVAC systems of the 80,000 SF Public Safety building, including replacement of
<br />Chillers, Pumps, and Air Handling Units.
<br />The Crane Resort & Residences – St. Philip, Barbados, BWI
<br />•Complete design of a 1000-Ton Absorption Chiller Plant, including Tertiary Pumps system, Domestic Hot Water
<br />distribution system, and Plant Controls, with underground chilled water and hot water supply & return
<br />distribution to each building of the Facility.
<br />Florida International University - Miami, Florida
<br />•Evaluation of the 7500-Tons Chiller Plant A and the 3000-Tons Chiller Plant B to automate both plants, including
<br />secondary chilled water loop. Prepared Control Drawings & Sequence of Operations for both Plants.
<br />Johnson’s Landing – Grand Cayman Island, BWI
<br />•MEP/FP Design for a new 16,000 SF mixed-use (Retail, Office & Restaurants) facility
<br />Key Largo School – Key Largo, Florida
<br />•HVAC Design
<br />•Furnish and install of high efficiency variable speed air-cooled chillers, chilled water pumps, chilled water
<br />distribution piping from the chillers to all the AHUs, chilled water zone AHUs, dual path chilled water AHU for the
<br />media center, chilled water 100% outdoor AHUs, and complete air distribution system to serve all spaces.
<br />Miami Dade College, various Campuses – Miami Beach, FL
<br />•HVAC Retrofit for Replacement of several Air Handling Units at Wolfson Campus
<br />•HVAC Hydronic Evaluation of Chilled Water Distribution for Building 9000 at Wolfson Campus
<br />•Renovation of HVAC systems for chemistry labs, performed load calculations and defined systems changes
<br />•Retrofit of existing HVAC to conserve energy. Defined changes to replace existing constant volume system with
<br />variable air volume system.
<br />•Performed load calculations and defined HVAC systems for the new Humanities building
<br />•MEP Design for the retrofit of Restrooms throughout several campuses to bring them up to ADA Compliance
<br />South Plantation Senior High School – Plantation, Florida
<br />•MEP Design Retrofit - Chiller & Pumps Replacement; ASHRAE 15 Retrofit
<br />University of Miami, Coral Gables School Campus – Miami, Florida
<br />•Numerous projects throughout, including Air Handling Units replacements, Interior Renovations, Retrofits, etc…
<br />University of Miami, Medical Campus – Miami, Florida
<br />•Numerous projects throughout, including Air Handling Units replacements, Interior Renovations, Retrofits, etc…
<br />University of Miami, Satellite Facilities – Miami, Florida
<br />•MEP Retrofit of several Library Storage Warehouses at Satellite Facilities
<br />United States Postal Service (USPS) – Pompano Beach, Florida
<br />•HVAC Design Retrofit / AHU’s Replacement
<br />West Pines Middle School - Ft. Lauderdale, Florida
<br />•Engineering Evaluation / Chiller Replacement MEP Design
<br />STAFF’S RELAVANT EXPERIENCE & WORK WITH OTHER FIRMS
<br /> City of Sunny Isles Beach City Hall & Police Complex – Sunny Isles Beach, FL
<br />•Engineer of Record and responsible for the HVAC Design of a new 57,000 SF government complex inclusive of City
<br />Hall, Commission Chambers, Police Facility, and a Public Library.
<br />Federal Reserve Bank, Birmingham Branch – Birmingham, AL
<br />•Engineering Services for the site selection, HVAC design and construction of a building approximately 238,000
<br />gross square feet, which included an atrium Smoke Evacuation system.
<br />Charlotte County Judicial Center – Punta Gorda, FL
<br />1315 NW 98th Court, Unit 15 • Doral, Florida 33172 • Tel: (305) 418-9177, Fax: (305) 418-9178
|