Laserfiche WebLink
perkinswill.com 105 <br />•Life-cycle cost analysis for mechanical systems and complete mechanical engineering design services for a new <br />four story, 162,500 SF courthouse. Building is being served by a 600-Ton full ice-storage system, consisting of a 20 <br />modular tank farm with a rated capacity of 150-Ton/Hrs per tank. <br />Nassau County Courthouse – Nassau County, Florida <br />•HVAC design for a new 100,000 SF county courthouse – four courtrooms, Judicial Chambers and staff offices. <br />This Facility included an atrium requiring Smoke Evacuation design. <br />Collier County Government Center – New Courthouse Annex Building – Naples, FL <br />•HVAC design for a new (4) story Annex Building inclusive of a 5,000 SF Atrium. Building was designed with <br />infrastructure in place to expand to (8) stories total. <br />Volusia County Intermodal Facility Parking Structure – Daytona Beach, FL <br />•HVAC design for a 56,000 SF parking garage space featuring a two-way traffic pattern with loading stops, a <br />parking area for buses and an employee break room. <br />Cape Coral City Hall Complex – Cape Coral, FL <br />•HVAC design of a new 86,000 SF, two-story Government building including a 250-seat City Council Chamber. <br />Ryder Center, Convocation Center/Arena, University of Miami - Coral Gables, FL <br />•HVAC design of a new 167,665 SF, 9,200 seat convocation center/arena with 24 VIP luxury suites. This Facility <br />included a Smoke Evacuation system design. <br />Camana Bay (West Indian Club) – Grand Cayman, Cayman Islands <br />•Master Planning and Design Development of 255-acres Multi-use development, including Standalone Chiller <br />Plants with full power generation. Construction Documents for Phase 1A with an estimated construction budget <br />cost of U.S $550 million. Design included HVAC, Plumbing and Fire Protection. The large capacity Chiller Plant for <br />Phase 1A consists of (3) Cooling Towers with Condenser Water pumps, and (3) 700-Tons Water Cooled Chillers <br />with Primary and Secondary Chilled Water Pumps and an underground chilled water piping loop. <br />•Design planning for a new 75,000 SF Cayman International School <br />Coral Gables Senior High School – Coral Gables, FL <br />•Mechanical Engineer for design criteria package for an 830-student station addition. The project consisted of a 3- <br />story classroom building. <br />City of Coral Gables and Parking Garage – Coral Gables, FL <br />•HVAC Design of a new 50,000 SF City Hall and Administration Building inclusive of a 375 car parking garage <br />designed to harmonize with the existing historic City Hall structures. <br />Doctor’s Charter School – Miami Shores, Florida <br />•HVAC & Plumbing Design for 40,000 SF K-12 School Campus consisting of a 2-story classroom building and <br />administration building and a multi-purpose/cafeteria building. The school required 180-tons of cooling capacity. <br />An air cooled chilled water system was utilized to provide this capacity. <br />Doral Senior High School (State School “FFF”) – El Doral, Florida <br />•Mechanical Engineer for design criteria package and schematic design for this new high school on an undersized <br />20-acre site. The project consisted of a multi-story building that incorporates the most current educational <br />concept for a high school. <br />Florida Christian School – Miami, Florida <br />•Mechanical Engineer for an addition to provide a new Media Center, Choral Suite, Biology Lab, Computer Lab, <br />and (8) high school classrooms. <br />Miami Dade College – Miami, Florida <br />•Renovation of HVAC systems for chemistry labs, performed load calculations and defined systems changes. <br />•Retrofit of existing HVAC to conserve energy. Defined changes to replace existing constant volume system with <br />variable air volume system. <br />•Performed load calculations and defined HVAC systems for the new Humanities building <br />Southwest Florida International Airport Terminal, Concourse and Parking Garage – Ft. Myers, FL <br />•Engineer of Record and responsible for the HVAC design of a new 3-story 700,000 SF terminal building, three <br />concourses, 28 gates and Central Chiller Plant (3600 tons, expanding to 7200 tons). <br />Miami International Airport, North Terminal Extension – Miami, FL <br />1315 NW 98th Court, Unit 15 • Doral, Florida 33172 • Tel: (305) 418-9177, Fax: (305) 418-9178