Laserfiche WebLink
118 City of Sunny Isles Beach New Facility Qualifications for Architectural Design Services <br />COMMERCIAL <br />MIAMI BEACH MULTI-PURPOSE PARKING FACILITY <br />The Miami Beach Multi-Purpose Parking Facility is an urban infill project located <br />next to the City Hall along Meridian Avenue. Our Landscape Master Plan links the <br />City Hall with the new facility and an existing ancillary office building along 17th <br />Street. These buildings form a corner open space at Meridian and 17th Street. The <br />space, now a new plaza, was re-designed as an urban shady oasis that acts as an <br />entry courtyard to the existing office building and the new multi-purpose parking <br />facility. <br />Location: Miami Beach, FL <br />Service: Master Plan, Schematic Design through <br />Construction Phase Services <br />Principal Firm: Perkins + Will <br />Date: 2011 <br />Project Cost: $550,000 <br />Client: City of Miami Beach <br />Principal-in-charge: Barry Miller <br />Comparable service: Landscape Architecture, Lighting Design <br />Duration: 2 Years <br />Reference: Jose Gelabert-Navia, (305)569-1333 <br />jose.gelabert-navia@perkinswill.com <br />8