Laserfiche WebLink
40 City of Sunny Isles Beach New Facility Qualifications for Architectural Design Services <br />www.brplusa.comCity of Sunny Isles Beach, New Facility at 18080 Collins Ave <br />Ricardo Duran has 17 years of experience in the fi eld of Electrical Engineering. His <br />experience includes the design, specifi cation and fi eld observation of Power distribution, <br />lighting, fi re alarm, CCTV, intercom, nurse call and emergency systems for a broad range of <br />facilities including healthcare, educational, commercial and residential. <br />PROJECT EXPERIENCE <br />709 Alton Road Mixed-Use Complex, Miami Beach, FL | Located at 709-745 Alton <br />Road, BR+A provided shell and core design of a 64,000 SF, 4-story building to be used <br />for offi ce and retail space. Additionally, the existing surface parking will be converted <br />into a multi-story garage for approximately 170 cars. There will also be a green roof / <br />amenity terrace to overlook South Beach’s residential neighborhoods to the east. <br />Berkowitz Development Group, Gables Station Vertical Retail, Coral Gables, FL | <br />350,000 SF vertical retail to be built over an existing parking lot which will hold 150,000 <br />cars. This mix-use development located in Miami’s most affl uent and densely populated <br />sub-market, may include residential and offi ce development and will be walking distance <br />to the Metro-Rail Station. Pursuing LEED Certifi cation. <br />Florida International University, Academic Health Center 5, Miami, FL | The AHC5 <br />120,000 SF Complex will house teaching labs for Public Health, faculty, research, and staff <br />offi ces, as well as wet and dry research labs for all three programs in a collaborative setting. <br />Pursuing LEED Silver Certifi cation. <br />Seminole Theatre Renovation, Homestead, FL | Interior renovation of the existing theatre, <br />with potential minor exterior renovations / improvements, enabling them to present a <br />variety of live performances and other types of events. <br />The District at 3635 NE 1st Avenue, Miami, FL | New 435,000 GSF, 19-story tower <br />consisting of approximately 195 one and two bedroom residential units (170,000 GSF), <br />60,000 GSF of retail space, and 205,000 GSF of parking for 500 cars. <br />Max Planck Florida Institute, New Research Building, Jupiter, FL | 110,000 SF research <br />building houses administrative offi ces; research library facilities; a large conference room <br />with distance learning and high-end AV capabilities; and an entry atrium / lobby / gathering <br />space. LEED Gold Certifi cation. <br />Broward Health North, Emergency Department-Surgery Suite-Cardiac Care Unit <br />Expansion, Deerfi eld Beach, Florida | 14,430 SF renovation and 8,000 SF addition to the <br />Surgical Suite, allowing an expansion of ORs with shelled space. Emergency Department <br />renovations will expand the area to 48 rooms and 50 treatment spaces including support <br />areas, new confi guration for the ambulance entry, entrance to the ED, and a walk-in <br />entrance. In addition, renovations to the entire Cardiac Critical Care Unit consisting of <br />patient rooms, restrooms, physician’s areas, and required support spaces are included. <br />Florida International University, Housing Facility at Biscayne Bay Campus, North Miami, <br />FL | The new 9-story, 410-unit waterfront dorm will house fi tness rooms, computer labs, <br />game rooms, study halls, integrated classrooms, and a pool with an amenity deck. Targeting <br />LEED Silver. <br />RICARDO DURAN, PE, LEED AP BD+C | Associate Principal <br />Electrical Engineer <br />EDUCATION <br />Bachelor of Science <br />Telecommunications and Electronic <br />Engineering <br />Martha Abreu University <br />Santa Clara, Cuba <br />REGISTRATION / CERTIFICATION <br />Professional Engineer, Florida <br />LEED Accredited Professional